WELL · 42-253-30669 · DISTRICT 7
Newman #1
Jones County · Triple T (Gunsight) field · NO Production · Vertical
Newman #1 (API 42-253-30669) is a well in Jones County operated by Circle Ridge Production Inc., completed February 3, 1994 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued December 31, 1993, permitted to 3,900 ft.
It was permitted by Mid-Tex Energy Inc. and has since transferred to Circle Ridge Production Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Cooke Sand, Gunsight.
Its lease has reported 20.3K barrels of oil and 7 mcf of gas since February 1994, last reporting in July 2026.
Operator of record
Permitted by Mid-Tex Energy Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed May 29, 2025 · 17 permits on file · (817) 917-0762
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Circle Ridge Production Inc. |
| Production reports | Circle Ridge Production, Inc.through Apr 2015 |
| Latest permit | Mid-Tex Energy Inc.Dec 31, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,900
- total depth, ft
- 1
- permits on file
- Dec 31, 1993
- last permit issued
- Feb 3, 1994
- completed
- 20.3K
- cumulative oil, bbl
- 7
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 3, 1994
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Newman O-8-27096 | Triple T (Gunsight) | Circle Ridge Production, Inc. | 1 | 20.3K | 7 | Feb 1994 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mid-Tex Energy Inc.Feb 1994 → Nov 1998
- 2Alexander Resources, Inc.Dec 1998 → Sep 1999
- 3Circle Ridge Production, Inc.Oct 1999 → Apr 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 419829-99 | Reenter | Mid-Tex Energy Inc. | Dec 31, 1993 | Dec 31, 1993 | Jan 12, 1994 | 3,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27096 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,813 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cooke Sand | 2,699 | -886 |
| GunsightGUNSIGHT LIME | 2,903 | -1,090 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,903 | 2,907 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 150 | — | — |
| 4.5 | 3,046 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1994 | Feb 14, 1994 | Yes |
| 00 | Feb 18, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-30669 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-30669 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25330669, documented in the API reference.