WELL · 42-253-31141 · DISTRICT 7
Williams, C. F. #2
Jones County · Vertical
Williams, C. F. #2 (API 42-253-31141) is a disposal or injection well in Jones County operated by Petroleum Corporation Of Texas under an active UIC permit.
The RRC has issued one drilling permit, issued February 22, 1979, permitted to 3,200 ft.
Its lease has reported 13.4K barrels of oil and 20 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 21.8K barrels injected in the 12 months reported through October 2025.
Operator of record
Petroleum Corporation of Texas
Breckenridge, TX · P-5 Y, filed May 4, 2026 · 225 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | M-Tex Resources, Inc.through Dec 2007 |
| Latest permit | Petroleum Corporation of TexasFeb 22, 1979 |
- 3,200
- total depth, ft
- 1
- permits on file
- Feb 22, 1979
- last permit issued
- —
- completed
- 13.4K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams, C.F. O-8-2652 | Noodle-Central | Sojourner Drilling Corporation | 2 | 13.4K | 20 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Breck Operating Corp.Jan 1993 → Sep 1996
- 2M-Tex Resources, Inc.Nov 1996 → Dec 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 43468-99 | Drill | Petroleum Corporation of Texas | Feb 22, 1979 | Feb 22, 1979 | May 7, 1979 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-2652 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,676 | 2,686 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 12.25 | 85 S |
| 2.375 | 2,620 | — | — |
| 4.5 | 3,192 | 7.875 | 330 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 30, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-31141 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-31141 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 21.8K
- bbl, last 12 reported months
- 631K
- bbl, all reported
- Oct 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000007951 | W-14 Disposal | Active | 500 | 1,000 | 2,840–2,850 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 21,760 · prior 12 21,812(0%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25331141, documented in the API reference.