WELL · 42-253-31529 · DISTRICT 7

Trayler #1

Plugged

Jones County · Jones County Regular field  · Vertical

Trayler #1 (API 42-253-31529) is a plugged well in Jones County, plugged June 13, 2002, last operated by G & F Oil Inc..

The RRC has issued one drilling permit, issued July 3, 1980, permitted to 1,876 ft.

It was permitted by Leonard, Jack and has since transferred to G & F Oil Inc. on the wellbore schedule.

Completion filings report one formation top, including Bluff Creek.

Its lease has reported 12.1K barrels of oil and 311 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

G & F Oil Inc.

Permitted by Leonard, Jack; the EWA schedule now lists a different operator.

Aledo, TX · P-5 Y, filed Jul 4, 2026 · 150 permits on file · (817) 939-8851

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleG & F Oil Inc.
Production reportsG & F Oil, Inc.through Apr 2026
Latest permitLeonard, JackJul 3, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,876
total depth, ft
1
permits on file
Jul 3, 1980
last permit issued
Jul 5, 1984
completed
12.1K
cumulative oil, bbl
311
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 5, 1984
Shut in
—
Plugged
Jun 13, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Trayler O-8-18389Jones County RegularG & F Oil, Inc.212.1K311Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 375 · prior 12 165(+127%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chalmers Exploration CompanyJan 1993 → Jan 1995
  2. 2D-Bar Leasing, Inc.Feb 1995 → Aug 2000
  3. 3One Epoch Energy, Inc.Mar 2001 → Aug 2002
  4. 4Rayco Operating, Inc.Apr 2005 → Dec 2006
  5. 5T & G Energy LLCFeb 2007 → Jul 2009
  6. 6G & F Oil, Inc.Feb 2010 → Apr 2026
  7. 7Bootstrap Exploration, Inc.Oct 2016 → Oct 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
85771-99DrillLeonard, JackJul 3, 1980Jul 3, 1980Jun 30, 19801,876

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-18389————

Formation tops

As filed on W-2/G-1. Subsea from 1,641 ft elevation.Download CSV →

FormationMD ftSubsea
Bluff Creek1,876-235

Perforations

Perforated and open-hole intervals.

FromToType
1,8521,866Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251001150 S
2.8751,800——
4.51,8767.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 25, 1984Jul 23, 1984—
00Jan 12, 1984Apr 23, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.27M
bbl, all reported
Oct 2001
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052504H-1 InjectionPlugged Jun 24, 2002001,852–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120002001

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25331529, documented in the API reference.