WELL · 42-253-32556 · DISTRICT 7

Bitter Creek Unit #2

Plugged

Jones County · Jones County Regular field  · Vertical

Bitter Creek Unit #2 (API 42-253-32556) is a plugged well in Jones County, plugged May 10, 2004, last operated by Bullet Development LLC.

The RRC has issued one drilling permit, issued May 17, 1983, permitted to 2,900 ft.

It was permitted by Chalmers Operating CO., Inc. and has since transferred to Bullet Development LLC on the wellbore schedule.

Its lease has reported 40K barrels of oil and 408 mcf of gas since January 1993, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Bullet Development LLC

Permitted by Chalmers Operating Co., Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Mar 4, 2026 · 57 permits on file · (325) 829-0357

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBullet Development LLC
Production reportsBullet Development, LLCthrough Apr 2026
Latest permitChalmers Operating Co., Inc.May 17, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,900
total depth, ft
1
permits on file
May 17, 1983
last permit issued
Jun 7, 1983
completed
40K
cumulative oil, bbl
408
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 7, 1983
Shut in
—
Plugged
May 10, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bitter Creek Unit O-8-17441Jones County RegularBullet Development, LLC1340K408Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 307 · prior 12 344(-11%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Alexander Energy CorporationJan 1993 → Jan 1994
  2. 2Chalmers Exploration CompanyFeb 1994 → Nov 1996
  3. 3Augusta Oil & GasDec 1996 → Nov 2002
  4. 4Encon Services, Inc.Aug 1998 → Nov 1999
  5. 5Augusta Oil & Gas IncDec 2002 → Dec 2015
  6. 6Bullet Development, LLCJan 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
195361-99DrillChalmers Operating Co., Inc.May 17, 1983May 17, 1983—2,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-17441————
—— O-8-17441————

Perforations

Perforated and open-hole intervals.

FromToType
—2,207Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510212.2590 S
4.52,2017.875200 S
2.3752,205——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 16, 1997Jun 13, 1983—
00Jan 12, 1984Jun 13, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 1999
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000085864H-1 InjectionPlugged May 20, 20046001,0952,190–2,204

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011999

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25332556, documented in the API reference.