WELL · 42-253-33650 · DISTRICT 7
Doty Bluff Creek Unit #10
Jones County · Doty (Bluff Creek) field · Vertical
Doty Bluff Creek Unit #10 (API 42-253-33650) is a plugged well in Jones County, plugged June 20, 1991, last operated by Chalmers Exploration Company.
The RRC has issued 2 drilling permits between 1987 and 1996, permitted to 1,950 ft.
It was permitted by Staley Oil Company and has since transferred to Chalmers Exploration Company on the wellbore schedule.
Completion filings report 2 formation tops, including T/Saddle Creek, Bluff Creek Sand.
Operator of record
Permitted by Staley Oil Company; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Jul 3, 1997 · 85 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chalmers Exploration Company |
| Production reports | none |
| Latest permit | Staley Oil CompanyJan 26, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,950
- total depth, ft
- 2
- permits on file
- Jan 26, 1996
- last permit issued
- Feb 23, 1988
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 23, 1988
- Shut in
- —
- Plugged
- Jun 20, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Doty, J. H. O-8-28362 | Jones County Regular | Scott Operating, Inc. | 1 | 0 | 0 | Jan 1998 – Jul 2026 |
| — O-8-6948 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 443909-99 | Reenter | Staley Oil Company | Jan 19, 1996 | Jan 26, 1996 | Jun 24, 1996 | 1,899 |
| 336683-99 | Drill | Chalmers Exploration Company | Sep 30, 1987 | Oct 7, 1987 | — | 1,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-6948 | — | — | — | — |
| — | — O-8-28362 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,682 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Saddle Creek | 1,875 | -193 |
| Bluff Creek Sand | 1,898 | -216 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,875 | 1,880 | Perforated |
| 1,898 | — | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 120 | 12.75 | 75 S |
| 5.5 | 1,898 | 7.875 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 1998 | Jan 12, 1998 | Yes |
| 00 | Jan 29, 1998 | — | — |
| 00 | Apr 7, 1988 | Feb 25, 1988 | Yes |
| 00 | Apr 5, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-33650 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-33650 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25333650, documented in the API reference.