WELL · 42-253-33899 · DISTRICT 7

Mead Strawn Unit #13WI

N

Jones County  · Vertical

Mead Strawn Unit #13WI (API 42-253-33899) is a former disposal or injection well in Jones County, last operated by L.C.S. Production Company; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1991 and 2006, permitted to 5,053 ft.

Completion filings report 2 formation tops, including Palo Pinto, Strawn.

Operator of record

L.C.S. Production Company

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitL.C.S. Production CompanyJun 13, 2006
5,053
total depth, ft
2
permits on file
Jun 13, 2006
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— O-8-26215——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
620607-99ReenterL.C.S. Production CompanyJun 7, 2006Jun 13, 2006—5,053
385441-99DrillThornton, Michael D.Mar 8, 1991Mar 8, 1991Mar 28, 19914,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-26215————

Formation tops

As filed on W-2/G-1. Subsea from 1,783 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto4,158-2,375
StrawnUPPER STRAWN4,482-2,699
StrawnLOWER STRAWN4,966-3,183

Perforations

Perforated and open-hole intervals.

FromToType
4,9664,986Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62518012.25100 S
5.55,0537.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 1991May 24, 1991Yes
00Jun 6, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096890H-1 InjectionNot activated1,0002,2254,481–4,980

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25333899, documented in the API reference.