WELL · 42-253-34078 · DISTRICT 7
Dorado #1
Jones County · Sedona (Hope Lime) field · NO Production · Vertical
Dorado #1 (API 42-253-34078) is a well in Jones County operated by Bustamante Oil Company, completed July 15, 1993 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued June 29, 1993, permitted to 2,250 ft.
It was permitted by Sedona Oil & Gas Corp. and has since transferred to Bustamante Oil Company on the wellbore schedule.
Its lease has reported 23.3K barrels of oil and 360 mcf of gas since July 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Sedona Oil & Gas Corp.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed May 4, 2026 · 4 permits on file · (432) 664-1103
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bustamante Oil Company |
| Production reports | Bustamante Oil Companythrough Jul 2021 |
| Latest permit | Sedona Oil & Gas Corp.Jun 29, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,250
- total depth, ft
- 1
- permits on file
- Jun 29, 1993
- last permit issued
- Jul 15, 1993
- completed
- 23.3K
- cumulative oil, bbl
- 360
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 15, 1993
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dorado O-8-26962 | Sedona (Hope Lime) | Bustamante Oil Company | 2 | 23.3K | 360 | Jul 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sedona Oil & Gas Corp.Jul 1993 → Oct 1999
- 2Wingrove Well Service, Inc.Mar 2000 → Apr 2017
- 3Bustamante Oil CompanyMay 2017 → Jul 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 413272-99 | Drill | Sedona Oil & Gas Corp. | Jun 28, 1993 | Jun 29, 1993 | Jul 2, 1993 | 2,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-26962 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,968 | 1,972 | Perforated |
| 1,978 | 1,984 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 109 | 12.25 | 85 S |
| 4.5 | 2,133 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 22, 1993 | Jul 27, 1993 | — |
| 00 | Aug 16, 1993 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-34078 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-34078 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25334078, documented in the API reference.