WELL · 42-253-34301 · DISTRICT 7
Flache Trust #1
Jones County · Truby (Strawn) field · Vertical
Flache Trust #1 (API 42-253-34301) is a plugged well in Jones County, plugged December 16, 2019, last operated by Bell Johnny Inc..
The RRC has issued 2 drilling permits between 1996 and 2006, permitted to 4,900 ft.
Completion filings report 4 formation tops, including B/Cj, Flippen, Palo Pinto, L Strawn.
Its 2 leases have reported 30.3K barrels of oil and 34.7K mcf of gas since January 1996, last reporting in July 2020. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Oct 2, 2020 · 13 permits on file · (214) 213-9095
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bell Johnny Inc. |
| Production reports | Bell, Johnny Inc.through Oct 2016 |
| Latest permit | Bell, Johnny Inc.Oct 18, 2006 |
- 4,900
- total depth, ft
- 2
- permits on file
- Oct 18, 2006
- last permit issued
- Dec 16, 2006
- completed
- 30.3K
- cumulative oil, bbl
- 34.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jul 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 16, 2006
- Shut in
- —
- Plugged
- Dec 16, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flache Trust O-8-29864 | Truby (Strawn) | Bell, Johnny Inc. | 1 | 10.4K | 22.9K | Dec 2006 – Jul 2020 |
| Flache Trust O-8-27773 | Truby (Palo Pinto) | Bell, Johnny Inc. | 1 | 19.9K | 11.8K | Jan 1996 – Jun 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fortson Oil CompanyJan 1996 → May 2000
- 2Bell, Johnny Inc.Jun 2000 → Oct 2016
- 3Laneer Resources CompanyAug 2000 → Dec 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 627182-99 | Recompletion | Bell, Johnny Inc. | Oct 6, 2006 | Oct 18, 2006 | — | 4,900 |
| 442932-99 | Drill | Fortson Oil Company | Jan 2, 1996 | Jan 9, 1996 | Jan 16, 1996 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27773 | — | — | — | — |
| — | — O-8-29864 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,762 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/CJ | 1,802 | -40 |
| Flippen | 2,380 | -618 |
| Palo Pinto | 4,076 | -2,314 |
| L Strawn | 4,509 | -2,747 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,123 | 4,128 | Perforated |
| 4,511 | 4,518 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 178 | 12.25 | 115 S |
| 5.5 | 4,299 | 7.875 | 75 S |
| 5.5 | — | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 4, 2007 | Dec 29, 2006 | Yes |
| 00 | Feb 28, 2007 | — | — |
| 00 | Apr 18, 1996 | Feb 20, 1996 | Yes |
| 00 | Mar 5, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-34301 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-34301 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25334301, documented in the API reference.