WELL · 42-253-34360 · DISTRICT 7
Hidden Manna #1
Jones County · Uncle Jack (Canyon Reef) field · Vertical
Hidden Manna #1 (API 42-253-34360) is a plugged well in Jones County, plugged May 7, 2007, last operated by Hgn Operating Company Inc..
The RRC has issued one drilling permit, issued September 25, 1996, permitted to 4,999 ft.
It was permitted by Fisher, Jack Inc. and has since transferred to Hgn Operating Company Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Lower Noodle Creek, Flippen Lime, Palo Pinto.
Operator of record
Permitted by Fisher, Jack Inc.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Mar 7, 2008 · 35 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | HGN Operating Company Inc. |
| Production reports | HGN Operating Company, Inc.through Dec 2005 |
| Latest permit | Fisher, Jack Inc.Sep 25, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 1
- permits on file
- Sep 25, 1996
- last permit issued
- Oct 25, 1996
- completed
- 0
- cumulative oil, bbl
- 136K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH May 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 25, 1996
- Shut in
- —
- Plugged
- May 7, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hidden Manna G-8-161070 | Uncle Jack (Canyon Reef) | HGN Operating Company, Inc. | 1 | 0 | 136K | Oct 1996 – May 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fisher, Jack Inc.Oct 1996 → Feb 1998
- 2HGN Operating Company, Inc.Sep 1998 → Dec 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 453039-99 | Drill | Fisher, Jack Inc. | Sep 23, 1996 | Sep 25, 1996 | Oct 1, 1996 | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-161070 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,909 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lower Noodle Creek | 2,594 | -685 |
| Flippen Lime | 2,842 | -933 |
| Palo PintoPALO PINTO REEF | 4,376 | -2,467 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,450 | 4,458 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 188 | 12.25 | 130 S |
| 5.5 | 4,579 | 7.875 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 29, 1997 | Nov 21, 1996 | Yes |
| 00 | Jan 15, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-34360 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-34360 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25334360, documented in the API reference.