WELL · 42-253-34475 · DISTRICT 7

Reef Truby #1

Plugged

Jones County · Big Nic Truby (Palo Pinto) field  · Vertical

Reef Truby #1 (API 42-253-34475) is a plugged well in Jones County, plugged August 2, 2013, last operated by Sojourner Drilling Corporation.

The RRC has issued one drilling permit, issued September 1, 1999, permitted to 3,950 ft.

It was permitted by Wells, Keith and has since transferred to Sojourner Drilling Corporation on the wellbore schedule.

Completion filings report 4 formation tops, including T/Bluff Cr. Sd., T/Noddle Cr. Lm, T/Noodle Cr. Lm., T/Palo Pinto.

Its lease has reported 2.46K barrels of oil since November 1999, last reporting in December 2013.

Operator of record

Sojourner Drilling Corporation

Permitted by Wells, Keith; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Oct 2003
Latest permitWells, KeithSep 1, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,950
total depth, ft
1
permits on file
Sep 1, 1999
last permit issued
Nov 2, 1999
completed
2.46K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1999 THROUGH Dec 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 2, 1999
Shut in
—
Plugged
Aug 2, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reef, Truby O-8-28695Big Nic Truby (Palo Pinto)Sojourner Drilling Corporation12.46K0Nov 1999 – Dec 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sojourner Drilling CorporationNov 1999 → Oct 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
487192-99DrillWells, KeithSep 1, 1999Sep 1, 1999Sep 28, 19993,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28695————

Formation tops

As filed on W-2/G-1. Subsea from 1,720 ft elevation.Download CSV →

FormationMD ftSubsea
T/Bluff Cr. Sd.2,310-590
T/Noddle Cr. LM2,524-804
T/Noodle Cr. Lm.2,524-804
T/Palo Pinto3,890-2,170

Perforations

Perforated and open-hole intervals.

FromToType
3,8973,899Perforated
3,9023,904Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510712.2580 S
4.54,0327.875475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2007Jan 18, 2007—
00Jan 7, 2000Nov 23, 1999Yes
00Dec 6, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
20K
bbl, all reported
Oct 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095253H-1 InjectionPlugged Aug 21, 20131,8001,1503,898–3,906

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 20,000(-100%)

02K4K20122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25334475, documented in the API reference.