WELL · 42-253-34819 · DISTRICT 7

Reeves #2

Y

Jones County · T. U. G. (Palo Pinto) field · NO Production  · Vertical

Reeves #2 (API 42-253-34819) is a well in Jones County operated by Dark Canyon Resources LLC, completed October 22, 2011 and listed as no production on the RRC schedule.

The RRC has issued 2 drilling permits between 2005 and 2011, permitted to 3,850 ft.

It was permitted by Texas United Geoproduction, Inc. and has since transferred to Dark Canyon Resources LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Coal, Crystall Falls, Gunsight, Palo Pinto.

Its lease has reported 20.6K barrels of oil since January 1995, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Dark Canyon Resources LLC

Permitted by Texas United Geoproduction, Inc.; the EWA schedule now lists a different operator.

Refugio, TX · P-5 Y, filed Apr 4, 2026 · 1 permits on file · (325) 725-1529

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDark Canyon Resources LLC
Production reportsDark Canyon Resources LLCthrough Sep 2025
Latest permitTexas United Geoproduction, Inc.Mar 17, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,850
total depth, ft
2
permits on file
Mar 17, 2011
last permit issued
Oct 22, 2011
completed
20.6K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 22, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reeves O-8-27403T. U. G. (Palo Pinto)Dark Canyon Resources LLC220.6K0Jan 1995 – Jul 2026

Oil, barrels lease total

Last 12 months 10 · prior 12 201(-95%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texas United Geoproduction, Inc.Jan 1995 → Apr 2013
  2. 2Paragon CorporationNov 2002 → Feb 2005
  3. 3P.I.D. Drilling IncMay 2014 → May 2018
  4. 4Overland Operating Company, LLCJun 2018 → Jan 2021
  5. 5Dark Canyon Resources LLCFeb 2024 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
711742-99RecompletionTexas United Geoproduction, Inc.Mar 8, 2011Mar 17, 2011Apr 12, 20112,300
611627-99DrillTexas United Geoproduction, Inc.Dec 27, 2005Dec 30, 2005—3,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27403————

Formation tops

As filed on W-2/G-1. Subsea from 1,686 ft elevation.Download CSV →

FormationMD ftSubsea
Coal2,256-570
Crystall Falls2,430-744
Gunsight2,546-860
Gunsight2,556-870
Palo Pinto3,795-2,109
Palo Pinto3,799-2,113

Perforations

Perforated and open-hole intervals.

FromToType
2,2422,248Perforated
3,7973,806Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251001075 S
4.53,7977.875330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 28, 2011Dec 28, 2011—
00Feb 16, 2007Aug 8, 2006Yes
00Oct 9, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25334819, documented in the API reference.