WELL · 42-253-35252 · DISTRICT 7
Carlton #1
Jones County · Tuxedo (Tannehill 2250) field · Producing · Vertical
Carlton #1 (API 42-253-35252) is a well in Jones County operated by Levee Oil LLC, completed August 29, 2012 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 5, 2012, permitted to 3,000 ft.
It was permitted by Royal Texan Energy CO. and has since transferred to Levee Oil LLC on the wellbore schedule.
Completion filings report one formation top, including Tannehill.
Its lease has reported 5.23K barrels of oil since August 2012, last reporting in July 2026.
Operator of record
Permitted by Royal Texan Energy Co.; the EWA schedule now lists a different operator.
Tuscola, TX · P-5 Y, filed May 4, 2026 · (325) 201-7346
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Levee Oil LLC |
| Production reports | Levee Oil LLCthrough Apr 2026 |
| Latest permit | Royal Texan Energy Co.Mar 5, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Mar 5, 2012
- last permit issued
- Aug 29, 2012
- completed
- 5.23K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 29, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carlton O-8-31061 | Tuxedo (Tannehill 2250) | Levee Oil LLC | 1 | 5.23K | 0 | Aug 2012 – Jul 2026 |
Oil, barrels lease total
Last 12 months 189 · prior 12 217(-13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Royal Texan Energy Co.Sep 2012 → Sep 2013
- 2Royal Texan Resources Co.Oct 2013 → Nov 2016
- 3Orland Oil & Gas LLCDec 2016 → Apr 2020
- 4Levee Oil LLCJan 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 733597-99 | Drill | Royal Texan Energy Co. | Feb 9, 2012 | Mar 5, 2012 | Jul 11, 2012 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31061 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,631 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 2,285 | -654 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,285 | 2,289 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 12.25 | 115 S |
| 4.5 | 2,360 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 30, 2012 | Sep 5, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-35252 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-35252 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25335252, documented in the API reference.