WELL · 42-255-30066 · DISTRICT 2
Gauntt, Ruby #1
Karnes County · Vertical
Gauntt, Ruby #1 (API 42-255-30066) is a permitted well in Karnes County filed by Crimson Energy Company, LC; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2000 and 2002, permitted to 6,476 ft.
Its 2 leases have reported 7.37K barrels of oil and 18.4K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Fort Worth, TX · P-5 Y, filed Jan 9, 2004 · 185 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | White Oak Operating Company LLCthrough Jan 2017 |
| Latest permit | Crimson Energy Company, LCFeb 1, 2002 |
- 6,476
- total depth, ft
- 2
- permits on file
- Feb 1, 2002
- last permit issued
- —
- completed
- 7.37K
- cumulative oil, bbl
- 18.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gauntt, Ruby G-2-50809 | Monson (Queen City) | Arete Operating Company, LLC | 1 | 0 | 13.1K | Jan 1993 – Jul 2026 |
| Gauntt, Ruby O-2-4635 | Monson (Luling 6270) | Arete Operating Company, LLC | 3 | 7.37K | 5.33K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pipeline Management, Inc.Jan 1993 → Aug 1995
- 2Dougherty, Robert IIINov 1995 → Jun 1996
- 3Progas Properties, Inc.Jul 1996 → Apr 1998
- 4Crimson Energy Company, LCMar 2002 → Jan 2003
- 5One Tec Operating, LLCMay 2004 → Mar 2006
- 6Milagro Exploration, LLCAug 2011 → Sep 2015
- 7White Oak Operating Company LLCNov 2015 → Jan 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 517181-99 | Recompletion | Crimson Energy Company, LC | Jan 29, 2002 | Feb 1, 2002 | — | 6,476 |
| 490744-99 | Recompletion | Crimson Energy Company, LC | Dec 30, 1999 | Jan 3, 2000 | — | 6,476 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-50809 | — | — | — | — |
| — | — O-2-4635 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,284 | 6,286 | Perforated |
| — | 6,286 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 741 | 12.25 | 360 S |
| 4.5 | 6,476 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jul 6, 1971 | — |
| 00 | Jan 12, 1984 | Jan 22, 1970 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-255-30066 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-255-30066 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25530066, documented in the API reference.