WELL · 42-255-31039 · DISTRICT 2

Samsel Gas Unit #1

N

Karnes County · Malo Domingo (Wilcox 10800) field  · Vertical

Samsel Gas Unit #1 (API 42-255-31039) is a well in Karnes County operated by Hanson Minerals CO., completed December 1, 1982.

The RRC has issued 2 drilling permits between 1982 and 2011, permitted to 12,000 ft.

It was permitted by Dune Operating Company and has since transferred to Hanson Minerals CO. on the wellbore schedule.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Jackson, Yegua.

No lease production has been reported under this well’s leases.

Operator of record

Hanson Minerals Co.

Permitted by Dune Operating Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 3, 1995 · 418 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHanson Minerals Co.
Production reportsWhite Marlin Operating Co, LLCthrough Apr 2026
Latest permitDune Operating CompanyApr 5, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Apr 5, 2011
last permit issued
Dec 1, 1982
completed
0
cumulative oil, bbl
3.05M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1982
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Samsel (Wilcox 9950') Gas Unit G-2-262191Malo Domingo (Wilcox 9950)White Marlin Operating Co, LLC1051.2KApr 2011 – Jul 2026
Sansel Gas Unit G-2-106003Malo Domingo (Wilcox 10650)Dune Operating Company103MJan 1993 – Apr 2012

Gas, mcf lease total

Last 12 months 765 · prior 12 547(+40%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hanson Minerals Co.Jan 1993 → Aug 1993
  2. 2Hanson Production CompanySep 1993 → Mar 2003
  3. 3Hilcorp Energy CompanyApr 2003 → Sep 2006
  4. 4Goldking Operating Company, Inc.Oct 2006 → May 2007
  5. 5Dune Operating CompanyJun 2007 → Jun 2015
  6. 6White Marlin Operating Co, LLCJul 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
713228-99RecompletionDune Operating CompanyMar 30, 2011Apr 5, 2011Apr 7, 201110,716
169174-99DrillHanson Minerals Co.Aug 16, 1982Aug 16, 1982Sep 16, 198212,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-106003————
—— G-2-262191————

Formation tops

As filed on W-2/G-1. Subsea from 288 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE3,980-3,692
Jackson4,760-4,472
Yegua5,800-5,512

Perforations

Perforated and open-hole intervals.

FromToType
9,9269,931Perforated
10,66810,690Perforated
11,01911,033Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,49917.52,090 S
5.58,6289.62575 S
9.6258,91712.25765 S
9.6258,91812.25765 S
2.37510,499——
2.37511,033——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 16, 2012Sep 20, 2011—
00Jan 12, 1984Jun 27, 1983—
00Jan 12, 1984May 10, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25531039, documented in the API reference.