WELL · 42-255-31281 · DISTRICT 1

George Unit 1 #1

Y

Karnes County · First Shot (Austin Chalk) field · Producing  · Horizontal · Sidetrack

George Unit 1 #1 (API 42-255-31281) is a horizontal well in Karnes County operated by Vsp Operating LLC, completed May 28, 1997 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1991 and 1996, permitted to 13,000 ft.

It was permitted by Modern Exploration, Inc. and has since transferred to Vsp Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Navarro, Taylor, Anacocho, Anacacho.

Its lease has reported 83.9K barrels of oil and 42.5K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

VSP Operating LLC

Permitted by Modern Exploration, Inc.; the EWA schedule now lists a different operator.

Castle Rock, CO · P-5 Y, filed Oct 4, 2025 · (405) 226-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVSP Operating LLC
Production reportsVSP Operating, LLCthrough Apr 2026
Latest permitModern Exploration, Inc.Oct 4, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
3
permits on file
Oct 4, 1996
last permit issued
May 28, 1997
completed
83.9K
cumulative oil, bbl
42.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 28, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
George Unit 1 O-1-13177First Shot (Austin Chalk)VSP Operating, LLC183.9K42.5KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 217 · prior 12 2,330(-91%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wainoco Oil & Gas CompanyJan 1993 → Feb 1993
  2. 2Tuskar (Texas), Inc.Mar 1993 → Jun 1996
  3. 3Modern Exploration, Inc.Jul 1996 → Sep 2016
  4. 4Glade Operating, LLCOct 2016 → May 2018
  5. 5Texatron Petroleum LLCJul 2018 → Jun 2019
  6. 6VSP Operating, LLCJan 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
453418-99Recompletion · sidetrackModern Exploration, Inc.Oct 3, 1996Oct 4, 1996May 4, 19978,900
384701-98DrillWainoco Oil & Gas CompanyAug 26, 1991Feb 15, 1991—12,130
384701-99DrillWainoco Oil & Gas CompanyFeb 15, 1991Feb 15, 1991Mar 27, 199113,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13177————

Formation tops

As filed on W-2/G-1. Subsea from 313 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro6,729-6,416
TaylorTAYLOR MKR7,320-7,007
TaylorTAYLOR SHALE7,468-7,155
Anacocho8,233-7,920
Anacacho8,236-7,923
Austin ChalkAUSTIN CAHALK8,321-8,008
Austin Chalk8,397-8,084

Perforations

Perforated and open-hole intervals.

FromToType
8,41211,603Open hole
8,41212,130Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1640——
10.7598514.75725 S
7.6258,4129.875210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 20, 1997Jun 16, 1997Yes
00Aug 13, 1991Jun 14, 1991Yes
00Aug 9, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25531281, documented in the API reference.