WELL · 42-255-31395 · DISTRICT 2

Rapido #1

Y

Karnes County · Ernie Baker (Pecan Gap) field · Temp Abandoned  · Vertical

Rapido #1 (API 42-255-31395) is a well in Karnes County operated by Three J Energy Inc., completed December 15, 1998 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued August 31, 1998, permitted to 9,000 ft.

It was permitted by Coyote Energy Inc and has since transferred to Three J Energy Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Carrizo, Olmos.

No lease production has been reported under this well’s leases.

Operator of record

Three J Energy Inc.

Permitted by Coyote Energy Inc; the EWA schedule now lists a different operator.

Seguin, TX · P-5 Y, filed Jun 4, 2026 · 2 permits on file · (830) 660-5864

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThree J Energy Inc.
Production reportsThree J Energy, Inc.through Jan 2024
Latest permitCoyote Energy IncAug 31, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Aug 31, 1998
last permit issued
Dec 15, 1998
completed
0
cumulative oil, bbl
15.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 15, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rapido G-2-177622Ernie Baker (Pecan Gap)Three J Energy, Inc.1015.9KDec 1998 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Coyote Energy, Inc.Dec 1998 → Nov 2008
  2. 2Oky Investments, Inc.Feb 2009 → Apr 2021
  3. 3Three J Energy, Inc.Mar 2022 → Jan 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
479160-99DrillCoyote Energy IncAug 31, 1998Aug 31, 1998Sep 23, 19989,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-177622————

Formation tops

As filed on W-2/G-1. Subsea from 362 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo3,450-3,088
Olmos8,837-8,475

Perforations

Perforated and open-hole intervals.

FromToType
8,8378,880Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,05112.25390 S
4.59,0007.875480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 2000Mar 17, 2000Yes
00Jul 14, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25531395, documented in the API reference.