WELL · 42-255-32668 · DISTRICT 2

Helena SWD #1

WaterY

Karnes County · Eagleville (Eagle Ford-2) field · Injection  · Vertical

Helena Swd #1 (API 42-255-32668) is a well in Karnes County operated by Pilot Water Solutions Swd LLC, completed June 15, 2013 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued July 19, 2012, permitted to 8,200 ft.

It was permitted by Greenhunter Water, LLC and has since transferred to Pilot Water Solutions Swd LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Yegua, Wilcox.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 5.5M barrels injected in the 12 months reported through March 2026.

Operator of record

Pilot Water Solutions SWD LLC

Permitted by Greenhunter Water, LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (432) 699-9366

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePilot Water Solutions SWD LLC
Production reportsnone
Latest permitGreenhunter Water, LLCJul 19, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,200
total depth, ft
1
permits on file
Jul 19, 2012
last permit issued
Jun 15, 2013
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 15, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Helena SWD O-2-10163Eagleville (Eagle Ford-2)Pilot Water Solutions SWD LLC100Aug 2012 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
744416-99DrillGreenhunter Water, LLCJul 11, 2012Jul 19, 2012Aug 16, 20128,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-10163————

Formation tops

As filed on W-2/G-1. Subsea from 308 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua3,250-2,942
Wilcox4,620-4,312
WilcoxMIDDLE WILCOX7,230-6,922
WilcoxMIDDLE WILCOX7,250-6,942

Perforations

Perforated and open-hole intervals.

FromToType
7,5747,586Perforated
7,5867,608Perforated
7,5867,750Perforated
7,6307,648Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62583712.25350 S
77,8378.75650 S
77,8738.75650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 2013Nov 25, 2013—
00Nov 9, 2012Sep 26, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.5M
bbl, last 12 reported months
63.8M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104980W-14 DisposalActive25,0003,4206,840–7,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,500,911 · prior 12 6,443,093(-15%)

0500K1M20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25532668, documented in the API reference.