WELL · 42-255-35341 · DISTRICT 2

J. P. Wright #1

Y

Karnes County · Eagleville (Eagle Ford-2) field · Injection  · Vertical

J. P. Wright #1 (API 42-255-35341) is a well in Karnes County operated by Evx Operating LLC, completed April 25, 2017 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued February 27, 2017, permitted to 7,300 ft.

It was permitted by BD Operating, LLC and has since transferred to Evx Operating LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Carrizo, Wilcox, Austin Chalk, Eagle Ford.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 6.4M barrels injected in the 12 months reported through March 2026.

Operator of record

Evx Operating LLC

Permitted by BD Operating, LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jan 4, 2026 · 1 permits on file · (713) 454-7022

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEvx Operating LLC
Production reportsnone
Latest permitBD Operating, LLCFeb 27, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,300
total depth, ft
1
permits on file
Feb 27, 2017
last permit issued
Apr 25, 2017
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 25, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
J. P. Wright O-2-11342Eagleville (Eagle Ford-2)Evx Operating LLC100Apr 2017 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
823435-99DrillBD Operating, LLCFeb 17, 2017Feb 27, 2017Mar 14, 20177,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-11342————

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo3,450-3,090
WilcoxWILCOX - DISPOSAL5,400-5,040
Austin ChalkAUSTIN CHALK - H2S——
Eagle FordEAGLE FORD - H2S——
EdwardsEDWARDS - H2S——
FrioFRIO - DISPOSAL——
Queen City——
Reklaw——
SligoSLIGO - H2S——
YeguaYEGUA - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
5,6426,948Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,94012.251,634 S
77,3008.75820 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 2017May 22, 2017Yes
00Jun 6, 2017——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6.4M
bbl, last 12 reported months
40.2M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000109247W-14 DisposalActive20,0002,7505,500–7,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,402,514 · prior 12 5,972,017(+7%)

0200K400K600K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25535341, documented in the API reference.