WELL · 42-257-30194 · DISTRICT 5
Hendricks Jesse E. #2
Kaufman County · Prairieville (Woodbine) field · Injection · Vertical
Hendricks Jesse E. #2 (API 42-257-30194) is a well in Kaufman County operated by Uphill Consulting LLC, completed July 28, 2023 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued December 16, 1977, permitted to 5,200 ft.
It was permitted by Texas City Refg. Inc. and has since transferred to Uphill Consulting LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Woodbine, Buda.
Its lease has reported 226K barrels of oil and 10.6K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 310K barrels injected in the 12 months reported through August 2025.
Operator of record
Permitted by Texas City Refg. Inc.; the EWA schedule now lists a different operator.
Pearland, TX · P-5 Y, filed Jan 4, 2026 · (940) 923-7859
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Uphill Consulting LLC |
| Production reports | Uphill Consulting LLCthrough Apr 2026 |
| Latest permit | Texas City Refg. Inc.Dec 16, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,200
- total depth, ft
- 1
- permits on file
- Dec 16, 1977
- last permit issued
- Jul 28, 2023
- completed
- 226K
- cumulative oil, bbl
- 10.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 28, 2023
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hendricks, Jesse E. O-5-2048 | Prairieville (Woodbine) | Uphill Consulting LLC | 3 | 226K | 10.6K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 327 · prior 12 1,546(-79%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Westland Oil Development Corp.Jan 1993 → Dec 1998
- 2Alpine Resources, Inc.Jan 1999 → May 2004
- 3Delta Exploration Company, Inc.Jul 2004 → Mar 2007
- 4Finley Resources, Inc.Apr 2007 → Mar 2015
- 5Layline Energy I LLCApr 2015 → Dec 2019
- 6Vinland Texas Services LLCJan 2020 → Jun 2024
- 7Beehive Operating, LLCJul 2024 → May 2025
- 8Uphill Consulting LLCFeb 2026 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 2638-99 | Drill | Texas City Refg. Inc. | Dec 16, 1977 | Dec 16, 1977 | Sep 6, 1977 | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-2048 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 348 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 1,795 | -1,447 |
| Austin Chalk | 2,540 | -2,192 |
| Austin ChalkBASE OF AUSTIN CHALK | 3,103 | -2,755 |
| WoodbineTOP OF WOODBINE FORMATION | 3,530 | -3,182 |
| WoodbineTOP OF WOODBINE SAND | 3,574 | -3,226 |
| BudaTOP OF BUDA LIME | 4,300 | -3,952 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,702 | 3,718 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 212 | 12.25 | 125 S |
| 4.5 | 3,901 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 18, 2024 | Jul 31, 2023 | — |
| 00 | Jan 12, 1984 | Dec 14, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-257-30194 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-257-30194 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 310K
- bbl, last 12 reported months
- 12.1M
- bbl, all reported
- Aug 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000005374 | H-1 Injection | Active | 4,000 | 1,785 | 3,574–3,738 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 310,254 · prior 12 292,145(+6%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25730194, documented in the API reference.