WELL · 42-261-00498 · DISTRICT 4
Sarita Field Oil & Gas Unit #120
Kenedy County · Vertical
Sarita Field Oil & Gas Unit #120 (API 42-261-00498) is a former disposal or injection well in Kenedy County, last operated by Exxon Mobil Corporation; its UIC permit is no longer active.
The RRC has issued 10 drilling permits (amended twice) between 1980 and 2001, permitted to 7,600 ft.
Its 9 leases have reported 510K barrels of oil and 628K mcf of gas since January 1993, last reporting in July 2026. The leases carry 70 wells, so these are lease totals, not this well alone.
Operator of record
Spring, TX · P-5 Y, filed Jan 4, 2026 · 1,223 permits on file · (346) 305-8668
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Headington Energy Partners, LLCthrough Apr 2026 |
| Latest permit | Exxon Mobil CorporationMar 1, 2001 |
- 7,600
- total depth, ft
- 12
- permits on file
- Mar 1, 2001
- last permit issued
- —
- completed
- 510K
- cumulative oil, bbl
- 628K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 9 leases this well is completed on; they carry 70 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sarita Field Oil & Gas Unit O-4-10608 | Wildcat | Headington Energy Partners, LLC | 10 | 10 | 7.51K | Jan 1993 – Jul 2026 |
| Sarita Field Oil & Gas Unit O-4-13623 | Sarita Shallow (Mio-Frio Cons.) | Headington Energy Partners, LLC | 43 | 158K | 262K | Sep 2010 – Jul 2026 |
| Sarita Field Oil & Gas Unit G-4-157310 | Sarita Shallow (Mio-Frio Cons.) | Exxon Mobil Corporation | 1 | 0 | 0 | Feb 1996 – Sep 2012 |
| Sarita Field Oil & Gas Unit O-4-9310 | Sarita (6-B) | Exxon Mobil Corporation | 8 | 248K | 119K | Jan 1993 – Dec 2010 |
| Sarita FLD Oil & Gas Unit O-4-10815 | Sarita (6-C) | Exxon Mobil Corporation | 3 | 79.9K | 174K | Jan 1993 – Dec 2010 |
| Sarita Field Oil & Gas Unit O-4-12999 | Sarita (7-F) | Exxon Mobil Corporation | 2 | 23.9K | 16.5K | Nov 2000 – Oct 2010 |
| Sarita Field Oil & Gas Unit G-4-173369 | Wildcat | Exxon Mobil Corporation | 1 | 0 | 0 | May 1999 – Apr 2000 |
| Sarita Field Oil & Gas Unit G-4-54175 | Sarita ( 7-B, E) | Exxon Corp. | 1 | 0 | 784 | Jan 1993 – Feb 1996 |
| Sarita Field Oil & Gas Unit G-4-128189 | Sarita (16-E) | Exxon Corp. | 1 | 0 | 48.7K | Jan 1993 – Feb 1996 |
Oil, barrels lease total
Last 12 months 20,560 · prior 12 4,944(+316%)
Gas, mcf lease total
Last 12 months 47,907 · prior 12 6,927(+592%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Dec 2003
- 3Headington Oil Company LLCSep 2014 → Nov 2014
- 4Headington Energy Partners, LLCMar 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 505988-99 | Recompletion | Exxon Mobil Corporation | Apr 7, 2000 | Mar 1, 2001 | Apr 26, 2000 | 5,980 |
| 493890-99 | Recompletion | Exxon Mobil Corporation | Apr 7, 2000 | Apr 7, 2000 | Apr 26, 2000 | 5,980 |
| 470950-99 | Recompletion | Exxon Corp. | Dec 8, 1997 | Dec 16, 1997 | May 10, 1999 | 5,980 |
| 426133-98 | Recompletion | Exxon Corp. | Dec 15, 1995 | Jul 25, 1994 | Jan 10, 1996 | 7,323 |
| 426133-99 | Recompletion | Exxon Corp. | Jul 21, 1994 | Jul 25, 1994 | — | 7,323 |
| 361936-99 | Recompletion | Exxon Corp. | Jul 25, 1989 | Jul 26, 1989 | — | 7,600 |
| 347136-97 | Recompletion | Exxon Corp. | Aug 18, 1988 | Jun 2, 1988 | — | 7,600 |
| 347136-99 | Recompletion | Exxon Corp. | May 31, 1988 | Jun 2, 1988 | — | 7,600 |
| 266517-99 | Recompletion | Exxon Corp. | Feb 8, 1985 | Feb 11, 1985 | — | 7,600 |
| 261186-99 | Recompletion | Exxon Corp. | Dec 12, 1984 | Dec 14, 1984 | — | 7,600 |
| 229009-99 | Recompletion | Exxon Corp. | Feb 9, 1984 | Feb 10, 1984 | — | 7,600 |
| 99951-99 | Other | Exxon Corp. | Nov 20, 1980 | Nov 20, 1980 | — | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-54175 | — | — | — | — |
| — | — G-4-128189 | — | — | — | — |
| — | — G-4-157310 | — | — | — | — |
| — | — G-4-173369 | — | — | — | — |
| — | — O-4-9310 | — | — | — | — |
| — | — O-4-10608 | — | — | — | — |
| — | — O-4-10815 | — | — | — | — |
| — | — O-4-12999 | — | — | — | — |
| — | — O-4-12999 | — | — | — | — |
| — | — O-4-13623 | — | — | — | — |
| — | — O-4-13623 | — | — | — | — |
| — | — O-4-13623 | — | — | — | — |
| — | — O-4-13623 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,034 | 5,040 | Perforated |
| 5,034 | 5,069 | Perforated |
| 5,034 | 5,985 | Perforated |
| 5,069 | 5,072 | Perforated |
| 5,346 | 5,382 | Perforated |
| 5,479 | 5,484 | Perforated |
| 5,534 | 5,544 | Perforated |
| 5,639 | 5,678 | Perforated |
| 5,671 | 5,684 | Perforated |
| 5,685 | 5,690 | Perforated |
| 5,729 | 5,785 | Perforated |
| 5,815 | 5,899 | Perforated |
| 5,978 | 5,985 | Perforated |
| 6,279 | 6,286 | Perforated |
| 6,472 | 6,491 | Perforated |
| 7,468 | 7,474 | Perforated |
| 7,517 | 7,525 | Perforated |
| — | 6,286 | Perforated |
| — | 6,491 | Perforated |
| — | 7,474 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 530 | 18.5 | 400 S |
| 9.625 | 2,431 | 12.25 | 600 S |
| 9.625 | 2,531 | 12.25 | 600 S |
| 1.25 | 6,154 | — | — |
| 2.875 | 7,582 | 8.75 | 1,105 S |
| 2.875 | 7,583 | 8.75 | 1,105 S |
| 2.875 | 7,588 | 8.75 | 1,105 S |
| 2.875 | 7,588 | — | — |
| 2.875 | 7,591 | 8.75 | 1,105 S |
| 2.875 | 7,591 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 2013 | Sep 24, 2012 | — |
| 00 | Dec 2, 2010 | Sep 16, 2010 | — |
| 00 | Dec 1, 2010 | Sep 16, 2010 | — |
| 00 | Oct 8, 2010 | Jul 20, 2000 | Yes |
| 00 | Oct 6, 2010 | Sep 16, 2010 | — |
| 00 | Oct 6, 2010 | Jul 20, 2000 | Yes |
| 00 | Oct 6, 2010 | Mar 8, 1996 | Yes |
| 00 | May 9, 2001 | Jul 20, 2000 | Yes |
| 00 | Mar 22, 2001 | — | — |
| 00 | Nov 2, 2000 | Jul 20, 2000 | Yes |
| 00 | Oct 27, 2000 | Jul 20, 2000 | — |
| 00 | Sep 8, 2000 | — | — |
| 00 | Jul 19, 1999 | Jul 6, 1999 | — |
| 00 | Jul 8, 1999 | — | — |
| 00 | Jul 17, 1996 | Mar 8, 1996 | Yes |
| 00 | May 29, 1996 | Mar 8, 1996 | Yes |
| 00 | Mar 25, 1996 | — | — |
| 00 | Mar 22, 1996 | — | Yes |
| 00 | Oct 28, 1988 | Aug 23, 1988 | Yes |
| 00 | Oct 14, 1988 | — | — |
| 00 | Jul 30, 1985 | Jul 2, 1985 | Yes |
| 00 | Jul 23, 1985 | — | — |
| 00 | May 8, 1985 | Apr 18, 1985 | — |
| 00 | May 4, 1985 | — | — |
| 00 | Aug 28, 1984 | Aug 10, 1984 | — |
| 00 | Jan 12, 1984 | Aug 10, 1984 | — |
| 00 | Jan 12, 1984 | Mar 13, 1981 | — |
| 00 | Jan 12, 1984 | Jun 23, 1976 | — |
| 00 | Jan 12, 1984 | Sep 19, 1972 | — |
| 00 | Jan 12, 1984 | Dec 16, 1968 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-00498 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-00498 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000004554 | UIC Permit | Plugged Nov 19, 2013 | 0 | 0 | 0–0 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26100498, documented in the API reference.