WELL · 42-261-30003 · DISTRICT 4
Sarita Field Oil & Gas Unit #122
Kenedy County · Sarita Shallow (Mio-Frio Cons.) field · Vertical
Sarita Field Oil & Gas Unit #122 (API 42-261-30003) is a plugged well in Kenedy County, plugged September 24, 2013, last operated by Headington Oil Company LLC.
The RRC has issued one drilling permit, issued June 22, 2000, permitted to 9,000 ft.
It was permitted by Exxon Mobil Corporation and has since transferred to Headington Oil Company LLC on the wellbore schedule.
Operator of record
Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Inactive, filed Dec 29, 2015 · 45 permits on file · (214) 696-0606
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Headington Oil Company LLC |
| Production reports | Exxon Corp.through Mar 1994 |
| Latest permit | Exxon Mobil CorporationJun 22, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Jun 22, 2000
- last permit issued
- Sep 15, 1975
- completed
- 0
- cumulative oil, bbl
- 120K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 15, 1975
- Shut in
- —
- Plugged
- Sep 24, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sarita Field Oil & Gas Unit G-4-64270 | Sarita Shallow (Mio-Frio Cons.) | Headington Oil Company LLC | 1 | 0 | 120K | Jan 1993 – Sep 2013 |
| Sarita Field Oil & Gas Unit G-4-191884 | Wildcat | Headington Oil Company LLC | 1 | 0 | 0 | Jan 2002 – Sep 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 496454-99 | Recompletion | Exxon Mobil Corporation | Jun 22, 2000 | Jun 22, 2000 | Oct 5, 2001 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-64270 | — | — | — | — |
| — | — G-4-191884 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,262 | 2,271 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 456 | 18.5 | 400 S |
| 13.375 | 556 | 18.5 | 400 S |
| 2.875 | 2,430 | — | 450 S |
| 8.625 | 2,547 | 12.25 | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 28, 2003 | Dec 2, 2002 | — |
| 00 | Jan 2, 2003 | — | — |
| 00 | Jan 12, 1984 | Dec 2, 1975 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30003 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30003 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130003, documented in the API reference.