WELL · 42-261-30126 · DISTRICT 4
Santa FE Ranch Mula Pasture #13
Kenedy County · Stillman (Shallow) field · Temp Abandoned · Vertical
Santa FE Ranch Mula Pasture #13 (API 42-261-30126) is a well in Kenedy County operated by Hughes Dan A. Company L.P., completed December 15, 1986 and listed as temp abandoned on the RRC schedule.
The RRC has issued 2 drilling permits between 1979 and 1986, permitted to 12,500 ft.
It was permitted by Exxon Corp. and has since transferred to Hughes Dan A. Company L.P. on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
Beeville, TX · P-5 Y, filed Nov 4, 2025 · 207 permits on file · (361) 358-3752
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hughes Dan A. Company L.P. |
| Production reports | none |
| Latest permit | Exxon Corp.May 15, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 2
- permits on file
- May 15, 1986
- last permit issued
- Dec 15, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 15, 1986
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch Mula Pasture G-4-84111 | Stillman (Shallow) | Hughes, Dan A. Company, L.P. | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 302161-99 | Recompletion | Exxon Corp. | May 14, 1986 | May 15, 1986 | — | 12,000 |
| 45856-99 | Drill | Exxon Corp. | Apr 5, 1979 | Apr 5, 1979 | Nov 5, 1975 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-84111 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,100 | 5,140 | Perforated |
| 5,626 | 5,640 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,586 | 17.5 | 1,680 S |
| 2.875 | 5,500 | — | — |
| 9.625 | 9,960 | 12.25 | 1,610 S |
| 5.5 | 11,988 | 6.75 | 1,035 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 29, 1987 | Jun 2, 1987 | — |
| 00 | Jan 12, 1984 | Sep 26, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30126 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30126 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 2023
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000060792 | W-14 Disposal | Canceled Mar 31, 2023 | 0 | 2,300 | 4,600–5,150 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130126, documented in the API reference.