WELL · 42-261-30653 · DISTRICT 4

East S. K. Mrs. #128

Plugged

Kenedy County · Rita (5-I W) field  · Vertical

East S. K. Mrs. #128 (API 42-261-30653) is a plugged well in Kenedy County, plugged June 7, 1989, last operated by Headington Oil Company LLC.

The RRC has issued 2 drilling permits between 1981 and 1986, permitted to 8,130 ft.

It was permitted by Exxon Corp. and has since transferred to Headington Oil Company LLC on the wellbore schedule.

Operator of record

Headington Oil Company LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Mar 6, 2015 · 45 permits on file · (214) 696-7715

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHeadington Oil Company LLC
Production reportsnone
Latest permitExxon Corp.May 15, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,130
total depth, ft
2
permits on file
May 15, 1986
last permit issued
Sep 26, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 26, 1986
Shut in
—
Plugged
Jun 7, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
302168-99RecompletionExxon Corp.May 14, 1986May 15, 1986—7,730
123938-99DrillExxon Corp.Jun 26, 1981Jun 26, 1981Jul 2, 19818,130

Perforations

Perforated and open-hole intervals.

FromToType
4,4984,502Perforated
4,9694,987Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51112.25775 S
2.8757,6837.8751,282 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 1987May 28, 1987Yes
00Jun 9, 1987——
00Feb 26, 1987Jan 29, 1987—
00Jan 12, 1984Nov 4, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.12K
bbl, last 12 reported months
5.12K
bbl, all reported
Feb 1987
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060796H-1 InjectionPlugged Jul 14, 19891,0002,0004,950–5,050

MONTHLY INJECTED, BBL · H-10 · LAST 4 REPORTED MONTHS

Last 12 months 5,124

01K2K3K1987

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130653, documented in the API reference.