WELL · 42-261-30687 · DISTRICT 4

Sarita Field Oil & Gas Unit #173

N

Kenedy County · Sarita ( 3-E) field  · Vertical

Sarita Field Oil & Gas Unit #173 (API 42-261-30687) is a well in Kenedy County operated by Exxon Mobil Corporation, completed December 3, 1999.

The RRC has issued 2 drilling permits between 1982 and 1985, permitted to 7,900 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Catahoula.

Its 2 leases have reported 178K barrels of oil and 295K mcf of gas since January 1993, last reporting in July 2026. The leases carry 54 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Jan 4, 2026 · 1,223 permits on file · (346) 305-8668

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsHeadington Energy Partners, LLCthrough Apr 2026
Latest permitExxon Corp.Mar 19, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,900
total depth, ft
2
permits on file
Mar 19, 1985
last permit issued
Dec 3, 1999
completed
178K
cumulative oil, bbl
295K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 3, 1999
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 54 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sarita Field Oil & Gas Unit O-4-13623Sarita Shallow (Mio-Frio Cons.)Headington Energy Partners, LLC43158K262KSep 2010 – Jul 2026
Sarita Field Oil & Gas Unit O-4-6963Sarita ( 3-E)Exxon Mobil Corporation1119.5K33KJan 1993 – Oct 2010

Oil, barrels lease total

Last 12 months 20,560 · prior 12 4,944(+316%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 47,907 · prior 12 6,927(+592%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Apr 1998
  2. 2Headington Oil Company LLCSep 2014 → Nov 2014
  3. 3Headington Energy Partners, LLCMar 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
269968-99RecompletionExxon Corp.Mar 18, 1985Mar 19, 1985—7,900
139439-99DrillExxon Corp.May 21, 1982May 21, 1982Nov 29, 19817,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-6963————
—— O-4-13623————

Formation tops

As filed on W-2/G-1. Subsea from 22 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1,450-1,428
CatahoulaCATAHOULA-ANAHUAC3,800-3,778
CatahoulaCATAHOULA-FRIO5,400-5,378

Perforations

Perforated and open-hole intervals.

FromToType
3,4123,446Perforated
3,4763,502Perforated
3,5023,510Perforated
3,5023,528Perforated
3,5143,528Perforated
3,6123,618Perforated
3,6843,692Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37527917.5300 S
9.6252,49912.25970 S
9.6252,49912.5970 S
9.6252,499——
2.8753,390——
5.57,4967.8751,830 S
5.57,496——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 18, 2022Mar 17, 2022—
00Oct 5, 2010May 11, 2000—
00Jul 6, 2000May 11, 2000—
00Feb 26, 1993Jan 15, 1993—
00Feb 19, 1986Feb 4, 1986Yes
00Feb 14, 1986——
00Jan 12, 1984Jul 7, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.71M
bbl, all reported
May 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000071634W-14 DisposalActive2,0001,7003,400–3,530

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130687, documented in the API reference.