WELL · 42-261-30887 · DISTRICT 4

East S. K. Mrs. #166

Plugged

Kenedy County · Rita ( 4-R-III) field  · Vertical

East S. K. Mrs. #166 (API 42-261-30887) is a plugged well in Kenedy County, plugged July 29, 2013, last operated by Headington Oil Company LLC.

The RRC has issued 2 drilling permits (amended once) between 1983 and 1986, permitted to 7,500 ft.

It was permitted by Exxon Corp. and has since transferred to Headington Oil Company LLC on the wellbore schedule.

Its 2 leases have reported 39K barrels of oil and 47.5K mcf of gas since January 1993, last reporting in July 2018. The leases carry 10 wells, so these are lease totals, not this well alone.

Operator of record

Headington Oil Company LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Mar 6, 2015 · 45 permits on file · (214) 696-7715

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHeadington Oil Company LLC
Production reportsExxon Mobil Corporationthrough Nov 2010
Latest permitExxon Corp.Oct 31, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
3
permits on file
Oct 31, 1986
last permit issued
Dec 12, 1986
completed
39K
cumulative oil, bbl
47.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 12, 1986
Shut in
—
Plugged
Jul 29, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
East, Mrs. S. K. O-4-9311WildcatHeadington Energy Partners, LLC500Jan 1993 – Jul 2018
East, S. K., Mrs. O-4-8747Rita ( 4-R-III)Headington Oil Company LLC539K47.5KJan 1993 – May 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Nov 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
322262-98RecompletionExxon Corp.Jan 8, 1987Oct 31, 1986—7,500
322262-99RecompletionExxon Corp.Oct 23, 1986Oct 31, 1986—7,500
222556-99DrillExxon Corp.Oct 22, 1984Dec 5, 1983Feb 12, 19847,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-8747————
—— O-4-9311————

Perforations

Perforated and open-hole intervals.

FromToType
3,8414,020Perforated
4,5984,608Perforated
5,1395,156Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,32512.25725 S
2.8757,0937.8751,210 S
2.8757,093——
2.8757,0977.8751,210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 2, 1987Jan 6, 1987Yes
00Jul 21, 1986Jul 3, 1986—
00Jul 12, 1986——
00Feb 3, 1986Jan 9, 1986—
00Jan 28, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000053399H-1 InjectionPlugged Oct 25, 201302,2004,530–0

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130887, documented in the API reference.