WELL · 42-261-30945 · DISTRICT 4

Erck #26

Plugged

Kenedy County · McGill (9800 Frio) field  · Vertical

Erck #26 (API 42-261-30945) is a plugged well in Kenedy County, plugged March 1, 2004, last operated by Txo Production Corp..

The RRC has issued 3 drilling permits between 1984 and 2000, permitted to 10,200 ft.

It was permitted by Pioneer Resources Producing, L.P and has since transferred to Txo Production Corp. on the wellbore schedule.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.

Operator of record

TXO Production Corp.

Permitted by Pioneer Resources Producing, L.P; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 1, 1992 · 3,227 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsPioneer Resources Producing, L.Pthrough Apr 1999
Latest permitPioneer Resources Producing, L.PMay 19, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,200
total depth, ft
3
permits on file
May 19, 2000
last permit issued
Sep 24, 1984
completed
0
cumulative oil, bbl
581K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 24, 1984
Shut in
—
Plugged
Mar 1, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Erck G-4-181438McGill (8200)Pioneer Natural Res. USA, Inc.100Sep 2000 – Feb 2004
Erck G-4-121951McGill (9400 Segment B)Pioneer Resources Producing, L.P10581KJan 1993 – Sep 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
  2. 2Bridge Oil Company, L. P.Jul 1993 → Sep 1994
  3. 3Parker & Parsley Development L.POct 1994 → Jan 1995
  4. 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
  5. 5Pioneer Resources Producing, L.PNov 1997 → Apr 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495315-99RecompletionPioneer Resources Producing, L.PMay 19, 2000May 19, 2000Aug 19, 200010,200
304857-99RecompletionTXO Production Corp.Aug 1, 1986Aug 4, 1986—10,200
243837-99DrillTXO Production Corp.Jun 22, 1984Jul 2, 1984Aug 31, 198410,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-121951————
—— G-4-181438————

Formation tops

As filed on W-2/G-1. Subsea from 67 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE166
Miocene (undifferentiated)TOP OF MIOCENE166
Frio4,000-3,933

Perforations

Perforated and open-hole intervals.

FromToType
8,2988,304Perforated
9,7329,736Perforated
9,7429,750Perforated
9,8009,806Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,51912.25950 S
2.8759,9987.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 6, 2001Mar 8, 2001Yes
00Mar 29, 2001——
00Sep 23, 1986Aug 14, 1986Yes
00Sep 6, 1986——
00Nov 28, 1984Oct 1, 1984—
00Nov 21, 1984Sep 26, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130945, documented in the API reference.