WELL · 42-261-31074 · DISTRICT 4
Sarita Field Oil & Gas Unit #205
Kenedy County · Sarita Shallow (Mio-Frio Cons.) field · Vertical
Sarita Field Oil & Gas Unit #205 (API 42-261-31074) is a plugged well in Kenedy County, plugged December 4, 2015, last operated by Headington Energy Partners LLC.
The RRC has issued 3 drilling permits (amended once) between 1986 and 1997, permitted to 7,300 ft.
It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.
Completion filings report 2 formation tops, including 2-Q Sand, 2-Q Sd.
Its 4 leases have reported 178K barrels of oil and 295K mcf of gas since January 1993, last reporting in July 2026. The leases carry 59 wells, so these are lease totals, not this well alone.
Operator of record
Headington Energy Partners LLC
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Jun 4, 2026 · 175 permits on file · (361) 885-0110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Headington Energy Partners LLC |
| Production reports | Headington Energy Partners, LLCthrough Apr 2026 |
| Latest permit | Exxon Corp.Dec 30, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,300
- total depth, ft
- 4
- permits on file
- Dec 30, 1997
- last permit issued
- Oct 10, 2012
- completed
- 178K
- cumulative oil, bbl
- 295K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 10, 2012
- Shut in
- —
- Plugged
- Dec 4, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 59 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sarita Field Oil & Gas Unit O-4-13623 | Sarita Shallow (Mio-Frio Cons.) | Headington Energy Partners, LLC | 43 | 158K | 262K | Sep 2010 – Jul 2026 |
| Sarita Field Oil & Gas Unit O-4-6963 | Sarita ( 3-E) | Exxon Mobil Corporation | 11 | 19.5K | 33K | Jan 1993 – Oct 2010 |
| Sarita Field Oil & Gas Unit O-4-12864 | Sarita ( 3-B) | Exxon Mobil Corporation | 1 | 0 | 0 | Sep 1999 – Oct 2010 |
| Sarita Field Oil & Gas Unit O-4-10098 | Sarita ( 3-C, E) | Exxon Mobil Corporation | 4 | 0 | 0 | Jan 1993 – May 2001 |
Oil, barrels lease total
Last 12 months 20,560 · prior 12 4,944(+316%)
Gas, mcf lease total
Last 12 months 47,907 · prior 12 6,927(+592%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Apr 1998
- 2Headington Oil Company LLCSep 2014 → Nov 2014
- 3Headington Energy Partners, LLCMar 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 470937-99 | Recompletion | Exxon Corp. | Dec 8, 1997 | Dec 30, 1997 | Sep 12, 1999 | 3,650 |
| 421757-99 | Recompletion | Exxon Corp. | Mar 4, 1994 | Mar 8, 1994 | Mar 27, 1994 | 3,650 |
| 300007-98 | Drill | Exxon Corp. | Nov 5, 1986 | Mar 21, 1986 | — | 7,300 |
| 300007-99 | Drill | Exxon Corp. | Mar 20, 1986 | Mar 21, 1986 | Apr 5, 1986 | 7,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-6963 | — | — | — | — |
| — | — O-4-10098 | — | — | — | — |
| — | — O-4-12864 | — | — | — | — |
| — | — O-4-13623 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 2-Q Sand | 3,380 | -3,357 |
| 2-Q SD | 3,380 | -3,357 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,380 | 3,405 | Perforated |
| 3,432 | 3,450 | Perforated |
| 3,597 | 3,602 | Perforated |
| 3,658 | 3,664 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 323 | 16 | 350 S |
| 13.375 | 323 | 17.5 | 350 S |
| 9.625 | 2,510 | 12.25 | 845 S |
| 9.625 | 2,512 | 12.25 | 795 S |
| 2.875 | 6,285 | 7.875 | 1,255 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 25, 2013 | Nov 1, 2012 | — |
| 00 | Oct 5, 2010 | Apr 27, 2004 | — |
| 00 | Jul 15, 2004 | Apr 27, 2004 | — |
| 00 | Oct 15, 2002 | Aug 21, 2002 | — |
| 00 | Oct 27, 1999 | Oct 7, 1999 | Yes |
| 00 | Oct 13, 1999 | — | — |
| 00 | Jan 27, 1995 | Nov 9, 1994 | Yes |
| 00 | Nov 18, 1994 | Nov 5, 1986 | Yes |
| 00 | Dec 3, 1986 | Nov 5, 1986 | Yes |
| 00 | Nov 19, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31074 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31074 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 6.3M
- bbl, all reported
- May 2015
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000091929 | W-14 Disposal | Plugged Dec 16, 2015 | 2,500 | 1,700 | 3,380–3,405 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131074, documented in the API reference.