WELL · 42-261-31086 · DISTRICT 4

Sarita Field Oil & Gas Unit #210

Plugged

Kenedy County · Sarita Shallow (Mio-Frio Cons.) field  · Directional

Sarita Field Oil & Gas Unit #210 (API 42-261-31086) is a plugged well in Kenedy County, plugged September 28, 2020, last operated by Headington Energy Partners LLC.

The RRC has issued one drilling permit (amended once), issued June 9, 1988, permitted to 6,050 ft.

It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.

Its 2 leases have reported 352K barrels of oil and 331K mcf of gas since January 1993, last reporting in July 2026. The leases carry 44 wells, so these are lease totals, not this well alone.

Operator of record

Headington Energy Partners LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Jun 4, 2026 · 175 permits on file · (361) 885-0110

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHeadington Energy Partners LLC
Production reportsHeadington Energy Partners, LLCthrough Apr 2026
Latest permitExxon Corp.Jun 9, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,050
total depth, ft
2
permits on file
Jun 9, 1988
last permit issued
Aug 16, 1988
completed
352K
cumulative oil, bbl
331K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 16, 1988
Shut in
—
Plugged
Sep 28, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 44 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sarita Field Oil & Gas Unit O-4-13623Sarita Shallow (Mio-Frio Cons.)Headington Energy Partners, LLC43158K262KSep 2010 – Jul 2026
Sarita Field Oil & Gas Unit O-4-11471Sarita (5-C, SW)Exxon Mobil Corporation1194K69KJan 1993 – Oct 2010

Oil, barrels lease total

Last 12 months 20,560 · prior 12 4,944(+316%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 47,907 · prior 12 6,927(+592%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Feb 2007
  3. 3Headington Oil Company LLCSep 2014 → Nov 2014
  4. 4Headington Energy Partners, LLCMar 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
346483-98DrillExxon Corp.Jul 20, 1988Jun 9, 1988—6,050
346483-99DrillExxon Corp.May 12, 1988Jun 9, 1988—6,050

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-11471————
—— O-4-13623————

Perforations

Perforated and open-hole intervals.

FromToType
4,4484,454Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37530717.5400 S
9.6251,21212.25225 S
2.8754,6167.875467 S
2.8755,0357.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 2010Sep 2, 1988Yes
00Nov 4, 1988Sep 2, 1988Yes
00Sep 27, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26131086, documented in the API reference.