WELL · 42-261-31118 · DISTRICT 4
Yturria #1
Kenedy County · Raymondville (F- 9) field · Vertical
Yturria #1 (API 42-261-31118) is a plugged well in Kenedy County, plugged May 12, 2013, last operated by Sue-Ann Production Company.
The RRC has issued 2 drilling permits between 1990 and 1991, permitted to 8,500 ft.
Completion filings report 6 formation tops, including Miocene (undifferentiated), Anahuac, Frio, F-6.
Operator of record
Victoria, TX · P-5 Y, filed Oct 5, 2001 · 246 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sue-Ann Production Company |
| Production reports | Petro-Hunt Corporationthrough Jun 1995 |
| Latest permit | Sue-Ann Production CompanyMar 27, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 2
- permits on file
- Mar 27, 1991
- last permit issued
- Jan 7, 1991
- completed
- 0
- cumulative oil, bbl
- 84.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 7, 1991
- Shut in
- —
- Plugged
- May 12, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yturria G-4-137630 | Raymondville (F-6,LOWER) | Cody Energy LLC | 1 | 0 | 84.8K | Jan 1993 – May 2013 |
| — G-4-136863 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sue-Ann Production CompanyJan 1993 → Sep 1993
- 2Petro-Hunt CorporationJan 1995 → Jun 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 386121-99 | Recompletion | Sue-Ann Production Company | Mar 26, 1991 | Mar 27, 1991 | Dec 16, 1990 | 8,500 |
| 382080-99 | Drill | Sue-Ann Production Company | Dec 7, 1990 | Dec 7, 1990 | Dec 16, 1990 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-136863 | — | — | — | — |
| — | — G-4-137630 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 20 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1 | 19 |
| Anahuac | 5,650 | -5,630 |
| Frio | 6,810 | -6,790 |
| F-6 | 7,510 | -7,490 |
| F-7 | 7,665 | -7,645 |
| F-9 | 7,728 | -7,708 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,510 | 7,515 | Perforated |
| 7,730 | 7,737 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,444 | 13.5 | 665 S |
| 5.5 | 7,881 | 8.75 | 380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 16, 1991 | Mar 25, 1991 | Yes |
| 00 | Apr 11, 1991 | — | — |
| 00 | Mar 20, 1991 | Jan 25, 1991 | Yes |
| 00 | Feb 12, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31118 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31118 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131118, documented in the API reference.