WELL · 42-261-31534 · DISTRICT 4

Sarita Field O&G Unit #306

Y

Kenedy County · Sarita Shallow (Mio-Frio Cons.) field · Temp Abandoned  · Vertical

Sarita Field O&G Unit #306 (API 42-261-31534) is a well in Kenedy County operated by Hilcorp Energy Company, completed June 26, 2020 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 12, 2010, permitted to 10,000 ft.

It was permitted by Newfield Exploration Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 7 formation tops, including Aa, 3e, Catahoula, 12b.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Newfield Exploration Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Mar 2018
Latest permitNewfield Exploration CompanyMar 12, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Mar 12, 2010
last permit issued
Jun 26, 2020
completed
0
cumulative oil, bbl
340K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 26, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sarita Field O&G Unit G-4-257069Sarita Shallow (Mio-Frio Cons.)Hilcorp Energy Company10340KJun 2010 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Newfield Exploration CompanyJun 2010 → Jul 2013
  2. 2Hilcorp Energy CompanyOct 2017 → Mar 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
692703-98DrillNewfield Exploration CompanyAug 17, 2010Mar 12, 2010Apr 23, 201010,000
692703-99DrillNewfield Exploration CompanyMar 10, 2010Mar 12, 2010—10,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-257069————

Formation tops

As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →

FormationMD ftSubsea
AA1,720-1,703
3E3,652-3,635
CatahoulaCATAHOULA-ANAHUAC3,860-3,843
12B6,300-6,283
14H6,864-6,847
15L7,164-7,147
18B8,129-8,112
12B——
14H——
15L——
18B——

Perforations

Perforated and open-hole intervals.

FromToType
1,7601,766Perforated
3,6523,656Perforated
6,8756,878Perforated
6,8836,888Perforated
7,0187,021Perforated
7,0537,058Perforated
7,6097,615Perforated
7,6287,640Perforated
7,9607,968Perforated
8,2658,268Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37580117.5860 S
9.6252,51012.25770 S
4.58,4278.752,305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 2020Jul 21, 2020—
00Feb 12, 2020Jan 14, 2020—
00Apr 6, 2012Oct 12, 2011—
00Sep 1, 2010Aug 18, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.