WELL · 42-261-31538 · DISTRICT 4
Sarita Field O&G Unit #308
Kenedy County · Sarita Shallow (Mio-Frio Cons.) field · Temp Abandoned · Vertical
Sarita Field O&G Unit #308 (API 42-261-31538) is a well in Kenedy County operated by Hilcorp Energy Company, completed July 10, 2011 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued May 17, 2010, permitted to 10,000 ft.
It was permitted by Newfield Exploration Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 5 formation tops, including 12b, 14h, 15l, 17a.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Newfield Exploration Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Oct 2017 |
| Latest permit | Newfield Exploration CompanyMay 17, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- May 17, 2010
- last permit issued
- Jul 10, 2011
- completed
- 0
- cumulative oil, bbl
- 232K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 10, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sarita Field O&G Unit G-4-257841 | Sarita Shallow (Mio-Frio Cons.) | Hilcorp Energy Company | 1 | 0 | 232K | Jul 2010 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Newfield Exploration CompanyAug 2010 → Sep 2016
- 2Hilcorp Energy CompanyOct 2016 → Oct 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 696005-99 | Drill | Newfield Exploration Company | May 14, 2010 | May 17, 2010 | Jun 12, 2010 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-257841 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 25 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 12B | 6,300 | -6,275 |
| 14H | 6,864 | -6,839 |
| 15L | 7,164 | -7,139 |
| 17A | 7,841 | -7,816 |
| 18B | 8,129 | -8,104 |
| 12B | — | — |
| 14H | — | — |
| 15L | — | — |
| 17A | — | — |
| 18B | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,867 | 6,872 | Perforated |
| 7,348 | 7,358 | Perforated |
| 7,729 | 7,734 | Perforated |
| 7,989 | 7,998 | Perforated |
| 8,033 | 8,050 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 807 | 17.5 | 780 S |
| 9.625 | 2,530 | 12.25 | 690 S |
| 4.5 | 8,750 | 8.75 | 1,840 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 24, 2012 | Aug 1, 2011 | — |
| 00 | Dec 3, 2010 | Dec 1, 2010 | — |
| 00 | Oct 29, 2010 | Oct 22, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31538 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31538 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131538, documented in the API reference.