WELL · 42-263-31097 · DISTRICT 11

Wood #2

N

Kent County  · Vertical

Wood #2 (API 42-263-31097) is a former disposal or injection well in Kent County, last operated by Bara Corporation; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1984 and 2002, permitted to 6,647 ft.

Operator of record

Bara Corporation

Flower Mound, TX · P-5 Y, filed Aug 6, 2004 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBara CorporationMar 25, 2002
6,647
total depth, ft
2
permits on file
Mar 25, 2002
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
517490-99ReenterBara CorporationFeb 11, 2002Mar 25, 2002—1,800
258126-99DrillCleere Operating CompanyNov 12, 1984Nov 19, 1984Dec 3, 19846,647

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
May 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091315W-14 DisposalCanceled Aug 7, 20141,2008251,652–1,718

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26331097, documented in the API reference.