WELL · 42-263-31549 · DISTRICT 8

Maben Cisco Unit #5

Plugged

Kent County · Maben (Cisco) field  · Vertical

Maben Cisco Unit #5 (API 42-263-31549) is a plugged well in Kent County, plugged August 5, 2024, last operated by Sojourner Drilling Corporation.

The RRC has issued one drilling permit, issued April 17, 1995, permitted to 5,900 ft.

Completion filings report 4 formation tops, including B/Permian Ls, Permian (undifferentiated), Cisco, T/Cisco Wtr Sd.

Its 2 leases have reported 1.18M barrels of oil and 392K mcf of gas since January 1993, last reporting in July 2026. The leases carry 26 wells, so these are lease totals, not this well alone.

Operator of record

Sojourner Drilling Corporation

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSojourner Drlg. Corp.Apr 17, 1995
5,900
total depth, ft
1
permits on file
Apr 17, 1995
last permit issued
May 7, 2010
completed
1.18M
cumulative oil, bbl
392K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 7, 2010
Shut in
—
Plugged
Aug 5, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 26 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maben Cisco Unit O-11-68530Maben (Cisco)Sojourner Drilling Corporation20801K221KMar 2003 – Jul 2026
Maben, E. L. O-11-66375Maben (Cisco)Sojourner Drilling Corporation6381K171KJan 1993 – Jun 2003

Oil, barrels lease total

Last 12 months 9,167 · prior 12 10,779(-15%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sojourner Drilling CorporationJan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
434729-99DrillSojourner Drlg. Corp.Apr 10, 1995Apr 17, 1995Apr 20, 19955,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66375————
—— O-11-68530————

Formation tops

As filed on W-2/G-1. Subsea from 2,195 ft elevation.Download CSV →

FormationMD ftSubsea
B/Permian LS5,058-2,863
Permian (undifferentiated)PERMIAN LS5,058-2,863
CiscoCISCO WATER SD.5,680-3,485
T/Cisco WTR SD5,680-3,485

Perforations

Perforated and open-hole intervals.

FromToType
5,5815,583Perforated
5,5865,600Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37514517.520 S
8.62555212.25505 S
4.55,7237.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 8, 2013Sep 5, 2012—
00Mar 7, 2003Jun 21, 1995Yes
00Jul 21, 1995Jun 21, 1995Yes
00Jul 3, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
208K
bbl, all reported
May 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000101724H-1 InjectionPlugged Aug 7, 20241,5002,7855,572–5,727

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26331549, documented in the API reference.