WELL · 42-263-31787 · DISTRICT 8

Long-Hall Unit #1

N

Kent County · Long-Hall (Tannehill) field  · Vertical

Long-Hall Unit #1 (API 42-263-31787) is a well in Kent County operated by Halliburton Operating Company, completed June 20, 2018.

The RRC has issued one drilling permit, issued May 15, 2007, permitted to 4,800 ft.

Completion filings report 4 formation tops, including Base Of Stockwether, Base Stockwether, Tannehill, Saddle Creek.

Its 2 leases have reported 356K barrels of oil since August 2007, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Halliburton Operating Company

Plano, TX · P-5 Y, filed Oct 4, 2025 · 108 permits on file · (214) 662-1405

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHalliburton Operating Company
Production reportsHalliburton Operating Companythrough Apr 2026
Latest permitHalliburton Operating CompanyMay 15, 2007
4,800
total depth, ft
1
permits on file
May 15, 2007
last permit issued
Jun 20, 2018
completed
356K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 20, 2018
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Long-Hall Unit O-11-69837Long-Hall (Tannehill)Halliburton Operating Company10356K0Apr 2012 – Jul 2026
Perlvina O-11-69196Long-Hall (Tannehill)Halliburton Operating Company12400Aug 2007 – Oct 2012

Oil, barrels lease total

Last 12 months 9,771 · prior 12 12,287(-20%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Halliburton Operating CompanyDec 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
638465-99DrillHalliburton Operating CompanyMay 7, 2007May 15, 2007May 31, 20074,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-69196————
—— O-11-69837————

Formation tops

As filed on W-2/G-1. Subsea from 2,131 ft elevation.Download CSV →

FormationMD ftSubsea
Base of Stockwether4,280-2,149
Base Stockwether4,280-2,149
Tannehill4,318-2,187
Saddle Creek4,338-2,207

Perforations

Perforated and open-hole intervals.

FromToType
4,3184,322Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37531017.5350 S
8.6251,17712.25460 S
5.54,3797.875265 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 2018Aug 15, 2018—
00Dec 7, 2016Nov 17, 2016—
00Oct 3, 2012Dec 10, 2007Yes
00Feb 5, 2008Dec 10, 2007Yes
00Jan 25, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
31.6K
bbl, all reported
May 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105006H-1 InjectionActive2,5002,1594,318–4,322

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26331787, documented in the API reference.