WELL · 42-263-31790 · DISTRICT 8
Melvi-Joe #1
Kent County · Long-Hall (Tannehill) field · Vertical
Melvi-Joe #1 (API 42-263-31790) is a well in Kent County operated by Halliburton Operating Company, completed August 18, 2007.
The RRC has issued one drilling permit, issued June 12, 2007, permitted to 4,800 ft.
Completion filings report 3 formation tops, including Coleman Junction, B/Coleman Junction, B/Stockwether.
Its 2 leases have reported 368K barrels of oil and 4.6K mcf of gas since August 2007, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 40.9K barrels injected in the 12 months reported through May 2025.
Operator of record
Plano, TX · P-5 Y, filed Oct 4, 2025 · 108 permits on file · (214) 662-1405
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Halliburton Operating Company |
| Production reports | Halliburton Operating Companythrough Apr 2026 |
| Latest permit | Halliburton Operating CompanyJun 12, 2007 |
- 4,800
- total depth, ft
- 1
- permits on file
- Jun 12, 2007
- last permit issued
- Aug 18, 2007
- completed
- 368K
- cumulative oil, bbl
- 4.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 18, 2007
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Long-Hall Unit O-11-69837 | Long-Hall (Tannehill) | Halliburton Operating Company | 10 | 356K | 0 | Apr 2012 – Jul 2026 |
| Melvi-Joe O-11-69135 | Long-Hall (Tannehill) | Halliburton Operating Company | 1 | 12.3K | 4.6K | Aug 2007 – Nov 2012 |
Oil, barrels lease total
Last 12 months 9,771 · prior 12 12,287(-20%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Halliburton Operating CompanyAug 2007 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 640006-99 | Drill | Halliburton Operating Company | Jun 1, 2007 | Jun 12, 2007 | Jun 18, 2007 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69135 | — | — | — | — |
| — | — O-11-69837 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,122 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionBASE OF COLEMAN JUNCTION | 3,795 | -1,673 |
| B/Coleman Junction | 3,795 | -1,673 |
| B/Stockwether | 4,260 | -2,138 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,306 | 4,310 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 343 | 17.5 | 375 S |
| 8.625 | 1,253 | 12.25 | 450 S |
| 5.5 | 4,395 | 7.875 | 265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 16, 2016 | Nov 16, 2016 | — |
| 00 | Oct 3, 2012 | Sep 5, 2007 | Yes |
| 00 | Sep 19, 2007 | Sep 5, 2007 | Yes |
| 00 | Sep 13, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-31790 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-31790 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 40.9K
- bbl, last 12 reported months
- 508K
- bbl, all reported
- May 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000103335 | H-1 Injection | Active | 2,500 | 2,150 | 4,306–4,318 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 40,904 · prior 12 38,359(+7%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26331790, documented in the API reference.