WELL · 42-263-31884 · DISTRICT 8

Long #1

Plugged

Kent County · Wildcat field  · Vertical

Long #1 (API 42-263-31884) is a plugged well in Kent County, plugged October 13, 2009, last operated by Henderson & Erickson Inc..

The RRC has issued one drilling permit, issued September 14, 2009, permitted to 4,900 ft.

It was permitted by Henderson & Erickson, Inc. and has since transferred to Henderson & Erickson Inc. on the wellbore schedule.

Operator of record

Henderson & Erickson Inc.

Permitted by Henderson & Erickson, Inc.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHenderson & Erickson, Inc.Sep 14, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
1
permits on file
Sep 14, 2009
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 13, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
684828-99DrillHenderson & Erickson, Inc.Sep 4, 2009Sep 14, 2009Sep 29, 20094,900

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
May 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000101413H-1 InjectionCanceled Mar 28, 20122,0003,0506,100–6,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26331884, documented in the API reference.