WELL · 42-263-31917 · DISTRICT 8
Hagar #5
Kent County · Wild Turkey (Tannehill) field · Vertical
Hagar #5 (API 42-263-31917) is a well in Kent County operated by Alpine Petroleum, completed May 4, 2010.
The RRC has issued one drilling permit, issued April 1, 2010, permitted to 4,900 ft.
Completion filings report one formation top, including Tannehill.
Its 2 leases have reported 160K barrels of oil since July 2009, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Sep 7, 2018 · 98 permits on file · (325) 665-8875
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Alpine Petroleum |
| Production reports | MWL Energy LLCthrough Apr 2026 |
| Latest permit | Alpine PetroleumApr 1, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,900
- total depth, ft
- 1
- permits on file
- Apr 1, 2010
- last permit issued
- May 4, 2010
- completed
- 160K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 4, 2010
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hagar Unit O-11-70147 | Wild Turkey (Tannehill) | MWL Energy LLC | 5 | 116K | 0 | Jun 2014 – Jul 2026 |
| Hagar O-11-69430 | Wild Turkey (Tannehill) | Alpine Petroleum | 2 | 44.6K | 0 | Jul 2009 – Sep 2014 |
Oil, barrels lease total
Last 12 months 11,546 · prior 12 2,584(+347%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Alpine PetroleumAug 2009 → Jul 2018
- 2Carroll Operating, LLCAug 2018 → Feb 2022
- 3MWL Energy LLCMar 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 693448-99 | Drill | Alpine Petroleum | Mar 25, 2010 | Apr 1, 2010 | Apr 14, 2010 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69430 | — | — | — | — |
| — | — O-11-70147 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,151 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 4,318 | -2,167 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,318 | 4,333 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 333 | 17.5 | 335 S |
| 4.5 | 4,437 | 7.875 | 480 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 25, 2014 | May 24, 2010 | Yes |
| 00 | Jul 27, 2010 | May 24, 2010 | Yes |
| 00 | Jun 28, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-31917 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-31917 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26331917, documented in the API reference.