WELL · 42-263-31947 · DISTRICT 8

Salt Creek Field Unit #H 75

Y

Kent County · Salt Creek field · Injection  · Directional

Salt Creek Field Unit #H 75 (API 42-263-31947) is a well in Kent County operated by Oxy USA Wtp LP, completed February 4, 2020 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 3, 2011, permitted to 9,000 ft.

Completion filings report 3 formation tops, including Clear Fork, Wolfcamp, Strawn.

Its lease has reported 140M barrels of oil and 284M mcf of gas since January 1993, last reporting in July 2026. The lease carries 538 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 32.2K barrels injected in the 12 months reported through May 2026.

Operator of record

OXY USA WTP LP

Houston, TX · P-5 Y, filed Sep 4, 2025 · 2,289 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsOXY USA WTP LPthrough Apr 2026
Latest permitOXY USA WTP LPMar 3, 2011
9,000
total depth, ft
2
permits on file
Mar 3, 2011
last permit issued
Feb 4, 2020
completed
140M
cumulative oil, bbl
284M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 4, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 538 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Salt Creek Field Unit O-11-5254Salt CreekOXY USA WTP LP538140M284MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,472,050 · prior 12 1,745,538(-16%)

0100K200K202420252026

Gas, mcf lease total

Last 12 months 3,945,103 · prior 12 5,060,124(-22%)

0200K400K600K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Jul 2005
  2. 2OXY USA WTP LPAug 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
711204-98DrillOXY USA WTP LPMar 26, 2012Mar 3, 2011Apr 15, 20119,000
711204-99DrillOXY USA WTP LPMar 1, 2011Mar 3, 2011Apr 18, 20119,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-5254————

Formation tops

As filed on W-2/G-1. Subsea from 2,101 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK2,04160
Clear ForkCLEARFORK2,06437
Clear ForkCLEARFORK2,06536
Wolfcamp3,834-1,733
Wolfcamp3,852-1,751
Strawn6,600-4,499
Strawn6,667-4,566

Perforations

Perforated and open-hole intervals.

FromToType
6,6116,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,58112.251,080 S
77,0148.75410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 2020Feb 10, 2020—
00Sep 29, 2016Sep 27, 2016Yes
00Jul 17, 2014Sep 16, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

32.2K
bbl, last 12 reported months
2.99M
bbl, all reported
May 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105358H-1 InjectionActive12,0003,0006,000–7,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 32,188 · prior 12 498,810(-94%)

050K100K150K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26331947, documented in the API reference.