WELL · 42-263-31998 · DISTRICT 8
Hagar Unit #8
Kent County · Wild Turkey (Tannehill) field · Vertical
Hagar Unit #8 (API 42-263-31998) is a plugged well in Kent County, plugged October 7, 2024, last operated by Mwl Energy LLC.
The RRC has issued one drilling permit, issued November 23, 2011, permitted to 4,900 ft.
It was permitted by Alpine Petroleum and has since transferred to Mwl Energy LLC on the wellbore schedule.
Completion filings report one formation top, including Tannehill.
Its lease has reported 116K barrels of oil since June 2014, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Alpine Petroleum; the EWA schedule now lists a different operator.
Hamlin, TX · P-5 Y, filed Jun 4, 2026 · (254) 541-6390
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | MWL Energy LLC |
| Production reports | MWL Energy LLCthrough Apr 2026 |
| Latest permit | Alpine PetroleumNov 23, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,900
- total depth, ft
- 1
- permits on file
- Nov 23, 2011
- last permit issued
- Dec 15, 2011
- completed
- 116K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 15, 2011
- Shut in
- —
- Plugged
- Oct 7, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hagar Unit O-11-70147 | Wild Turkey (Tannehill) | MWL Energy LLC | 5 | 116K | 0 | Jun 2014 – Jul 2026 |
Oil, barrels lease total
Last 12 months 11,546 · prior 12 2,584(+347%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Alpine PetroleumJun 2014 → Jul 2018
- 2Carroll Operating, LLCAug 2018 → Feb 2022
- 3MWL Energy LLCMar 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 728460-99 | Drill | Alpine Petroleum | Nov 16, 2011 | Nov 23, 2011 | Dec 2, 2011 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-70147 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,128 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 4,308 | -2,180 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,308 | 4,324 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 324 | 17.5 | 375 S |
| 4.5 | 4,696 | 7.875 | 680 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 6, 2015 | Sep 29, 2014 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-31998 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-31998 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 96
- bbl, last 12 reported months
- 134K
- bbl, all reported
- May 2024
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000106985 | H-1 Injection | Plugged Dec 20, 2024 | 4,000 | 2,154 | 4,308–4,324 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 96 · prior 12 152(-37%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26331998, documented in the API reference.