WELL · 42-263-32062 · DISTRICT 8
Garth -B- #4
Kent County · Long-Hall (Tannehill) field · Vertical
Garth -B- #4 (API 42-263-32062) is a well in Kent County operated by Sojourner Drilling Corporation, completed August 13, 2013.
The RRC has issued one drilling permit, issued July 1, 2013, permitted to 4,900 ft.
Completion filings report 2 formation tops, including Tannehill, Saddle Creek.
Its 2 leases have reported 233K barrels of oil since August 2013, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
Sojourner Drilling Corporation
Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sojourner Drilling Corporation |
| Production reports | Sojourner Drilling Corporationthrough Apr 2026 |
| Latest permit | Sojourner Drilling CorporationJul 1, 2013 |
- 4,900
- total depth, ft
- 1
- permits on file
- Jul 1, 2013
- last permit issued
- Aug 13, 2013
- completed
- 233K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 13, 2013
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Girard (Tannehill) Unit O-11-70738 | Long-Hall (Tannehill) | Sojourner Drilling Corporation | 9 | 202K | 0 | Aug 2018 – Jul 2026 |
| Garth -B- O-11-70112 | Long-Hall (Tannehill) | Sojourner Drilling Corporation | 1 | 31.1K | 0 | Aug 2013 – Dec 2018 |
Oil, barrels lease total
Last 12 months 33,457 · prior 12 40,363(-17%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sojourner Drilling CorporationAug 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 765506-99 | Drill | Sojourner Drilling Corporation | Jun 26, 2013 | Jul 1, 2013 | Jul 22, 2013 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-70112 | — | — | — | — |
| — | — O-11-70738 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,128 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 4,284 | -2,156 |
| Saddle Creek | 4,379 | -2,251 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,306 | 4,312 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 337 | 17.5 | 500 S |
| 8.625 | 1,175 | 12.25 | 375 S |
| 5.5 | 4,411 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 2018 | Aug 29, 2013 | Yes |
| 00 | Apr 29, 2014 | Aug 29, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-32062 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-32062 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26332062, documented in the API reference.