WELL · 42-269-31177 · DISTRICT 8

Simpson #1

Plugged

King County · One Joint Off (Tannehill) field  · Vertical

Simpson #1 (API 42-269-31177) is a plugged well in King County, plugged April 20, 1993, last operated by Two Way Oil CO..

The RRC has issued one drilling permit, issued December 29, 1983, permitted to 3,500 ft.

It was permitted by Sojourner Drlg. Corp. and has since transferred to Two Way Oil CO. on the wellbore schedule.

Completion filings report 3 formation tops, including B/Coleman Jc. Ls, T/Tannehill, T/Saddle Creek.

Operator of record

Two Way Oil Co.

Permitted by Sojourner Drlg. Corp.; the EWA schedule now lists a different operator.

Odessa, TX · P-5 Y, filed Nov 5, 1993

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTwo Way Oil Co.
Production reportsnone
Latest permitSojourner Drlg. Corp.Dec 29, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Dec 29, 1983
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 20, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Simpson O-11-64768One Joint Off (Tannehill)Two Way Oil Co.200Jan 1993 – Sep 1995

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
225207-99DrillSojourner Drlg. Corp.Dec 29, 1983Dec 29, 1983—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-64768————

Formation tops

As filed on W-2/G-1. Subsea from 1,747 ft elevation.Download CSV →

FormationMD ftSubsea
B/Coleman Jc. LS2,823-1,076
T/Tannehill3,374-1,627
T/Saddle Creek3,499-1,752

Perforations

Perforated and open-hole intervals.

FromToType
3,2743,280Perforated
3,3613,368Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522112.25230 S
4.53,4997.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 20, 1992Mar 25, 1992—
00Apr 3, 1992Mar 3, 1992—
00Apr 24, 1984Apr 5, 1984—
00Apr 12, 1984Apr 5, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

56.8K
bbl, last 12 reported months
65.3K
bbl, all reported
Aug 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074767H-1 InjectionPlugged May 3, 19932001,6503,361–3,368

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 56,760 · prior 12 8,496(+568%)

05K10K15K19911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26931177, documented in the API reference.