WELL · 42-269-31763 · DISTRICT 8
Burnett S. B. N #79
King County · Anne Tandy (Congl.) field · Vertical
Burnett S. B. N #79 (API 42-269-31763) is a plugged well in King County, plugged June 6, 2013, last operated by Hunt Oil Company.
The RRC has issued one drilling permit, issued December 11, 1987, permitted to 7,000 ft.
It was permitted by Gunn Management Company and has since transferred to Hunt Oil Company on the wellbore schedule.
Completion filings report 5 formation tops, including T/Caddo Ls, T/Conglomerate, T/Mississippian Ls, T/Ellenburger Ls.
Operator of record
Permitted by Gunn Management Company; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Mar 4, 2026 · 1,472 permits on file · (214) 978-8000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hunt Oil Company |
| Production reports | none |
| Latest permit | Gunn Management CompanyDec 11, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Dec 11, 1987
- last permit issued
- Feb 26, 1988
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 26, 1988
- Shut in
- —
- Plugged
- Jun 6, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Burnett, S. B. "N" O-11-61495 | Anne Tandy (Congl.) | Hunt Oil Company | 1 | 0 | 0 | Jan 1993 – Nov 2013 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 340006-99 | Drill | Gunn Management Company | Dec 10, 1987 | Dec 11, 1987 | — | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-61495 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,722 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Caddo LS | 5,688 | -3,966 |
| T/Conglomerate | 5,808 | -4,086 |
| T/Mississippian LS | 5,830 | -4,108 |
| T/Ellenburger LS | 6,144 | -4,422 |
| T/Cambrian Sand | 6,356 | -4,634 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,398 | 6,410 | Perforated |
| 6,436 | 6,458 | Perforated |
| 6,477 | 6,490 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 261 | 12.25 | 150 S |
| 7 | 6,589 | 8.75 | 350 S |
| 7 | — | — | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 31, 1988 | Apr 8, 1988 | Yes |
| 00 | Aug 24, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-31763 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-31763 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Aug 1994
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000069422 | W-14 Disposal | Not activated | 11,250 | 2,850 | 6,388–6,544 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26931763, documented in the API reference.