WELL · 42-269-31811 · DISTRICT 8

Burnett S. B. Estate GG #34

Plugged

King County · Anne Tandy (Strawn) field  · Vertical

Burnett S. B. Estate GG #34 (API 42-269-31811) is a plugged well in King County, plugged March 7, 2014, last operated by High River Res Operating LLC.

The RRC has issued one drilling permit, issued May 24, 1988, permitted to 6,000 ft.

It was permitted by Gunn Management Company and has since transferred to High River Res Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Coleman Junction, Base Stockwether, Cisco, Twin Peaks.

Its 2 leases have reported 90.8K barrels of oil and 19.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

High River Res Operating LLC

Permitted by Gunn Management Company; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jul 4, 2026 · 6 permits on file · (713) 824-5449

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHigh River Res Operating LLC
Production reportsHigh River Res Operating, LLCthrough Apr 2026
Latest permitGunn Management CompanyMay 24, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
May 24, 1988
last permit issued
Jul 14, 1988
completed
90.8K
cumulative oil, bbl
19.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 14, 1988
Shut in
—
Plugged
Mar 7, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burnett, S. B. Estate "GG" O-11-69897Anne Tandy (Strawn)High River Res Operating, LLC1042.8K8.9KOct 2012 – Jul 2026
Burnett, S. B. Estate "GG" O-11-66224GG (Twin Peaks)Hunt Oil Company147.9K10.9KJan 1993 – Mar 2013

Oil, barrels lease total

Last 12 months 2,010 · prior 12 2,429(-17%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 1,556 · prior 12 1,553(+0%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Oil CompanyJan 1993 → Oct 2020
  2. 2High River Res Operating, LLCDec 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
346868-99DrillGunn Management CompanyMay 23, 1988May 24, 1988—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66224————
—— O-11-69897————

Formation tops

As filed on W-2/G-1. Subsea from 1,743 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionBASE COLEMAN JUNCTION2,414-671
Base Stockwether2,810-1,067
CiscoCISCO REED3,570-1,827
Twin Peaks5,236-3,493
Conglomerate5,824-4,081
Mississippian5,835-4,092

Perforations

Perforated and open-hole intervals.

FromToType
5,2325,240Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62527112.25200 S
5.55,4487.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 14, 2013Jul 25, 1988Yes
00Aug 1, 1988Jul 25, 1988Yes
00Jul 28, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26931811, documented in the API reference.