WELL · 42-269-31874 · DISTRICT 8

Foster #1

Plugged

King County · Quick Draw (Tannehill Upper) field  · Vertical

Foster #1 (API 42-269-31874) is a plugged well in King County, plugged January 7, 2000, last operated by L.C.S. Production Company.

The RRC has issued one drilling permit, issued December 30, 1988, permitted to 4,500 ft.

It was permitted by Petroleum Investment Opp., Inc. and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report 3 formation tops, including Stockweather Limestone, Tannehill, Saddle Creek.

Its lease has reported 83.9K barrels of oil and 12.3K mcf of gas since January 1993, last reporting in February 2001. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Permitted by Petroleum Investment Opp., Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Jun 1999
Latest permitPetroleum Investment Opp., Inc.Dec 30, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Dec 30, 1988
last permit issued
Jul 22, 1998
completed
83.9K
cumulative oil, bbl
12.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 22, 1998
Shut in
—
Plugged
Jan 7, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Foster O-11-66447Quick Draw (Tannehill Upper)L.C.S. Production Company583.9K12.3KJan 1993 – Feb 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energy Resource & Develop., CorpJan 1993 → Jan 1998
  2. 2Smith Pipe of AbileneFeb 1998 → Aug 1998
  3. 3L.C.S. Production CompanySep 1998 → Jun 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
354541-99DrillPetroleum Investment Opp., Inc.Dec 22, 1988Dec 30, 1988—4,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66447————

Formation tops

As filed on W-2/G-1. Subsea from 2,083 ft elevation.Download CSV →

FormationMD ftSubsea
Stockweather Limestone3,850-1,767
TannehillUPPER TANNEHILL3,946-1,863
Saddle Creek4,000-1,917

Perforations

Perforated and open-hole intervals.

FromToType
3,9463,962Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62595512.25465 S
4.54,0407.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 20, 1998Aug 26, 1998—
00Feb 7, 1990Jan 4, 1990Yes
00Jan 25, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

304
bbl, last 12 reported months
7.72K
bbl, all reported
Apr 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087945H-1 InjectionPlugged Jan 25, 20007501,5003,946–3,962

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 304 · prior 12 7,413(-96%)

02K4K19992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26931874, documented in the API reference.