WELL · 42-269-31972 · DISTRICT 8
Foster #2A
King County · Vertical
Foster #2A (API 42-269-31972) is a plugged well in King County, plugged May 14, 1990, last operated by Energy Resource & Develop., Corp.
The RRC has issued 2 drilling permits between 1990 and 1991, permitted to 4,500 ft.
Completion filings report 2 formation tops, including Stockweather, Tannehill.
Its lease has reported 83.9K barrels of oil and 12.3K mcf of gas since January 1993, last reporting in February 2001. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Energy Resource & Develop., Corp
Rockwall, TX · P-5 Y, filed Sep 4, 1998 · 27 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | L.C.S. Production Companythrough Jun 1999 |
| Latest permit | Energy Resource & Develop., CorpSep 5, 1991 |
- 4,500
- total depth, ft
- 2
- permits on file
- Sep 5, 1991
- last permit issued
- —
- completed
- 83.9K
- cumulative oil, bbl
- 12.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- May 14, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Foster O-11-66447 | Quick Draw (Tannehill Upper) | L.C.S. Production Company | 5 | 83.9K | 12.3K | Jan 1993 – Feb 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Energy Resource & Develop., CorpJan 1993 → Jan 1998
- 2Smith Pipe of AbileneFeb 1998 → Aug 1998
- 3L.C.S. Production CompanySep 1998 → Jun 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 391613-99 | Reenter | Energy Resource & Develop., Corp | Sep 4, 1991 | Sep 5, 1991 | Sep 10, 1991 | 4,500 |
| 371419-99 | Drill | Energy Resource & Develop., Corp | Mar 26, 1990 | Mar 30, 1990 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-66447 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,086 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,858 | 3,868 | Perforated |
| 3,958 | 3,968 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 896 | 12.25 | 465 S |
| 5.5 | 4,044 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 10, 1998 | Aug 26, 1998 | — |
| 00 | May 31, 1994 | Apr 28, 1994 | — |
| 00 | Nov 25, 1991 | Oct 18, 1991 | Yes |
| 00 | Nov 6, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-31972 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-31972 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 75.5K
- bbl, all reported
- Apr 1999
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000078382 | H-1 Injection | Plugged Jan 25, 2000 | 250 | 1,500 | 3,958–3,968 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 8,625(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26931972, documented in the API reference.