WELL · 42-269-32016 · DISTRICT 8
Masterson Ranch A #11
King County · Floyce (Bunger Lime) field · Vertical
Masterson Ranch A #11 (API 42-269-32016) is a plugged well in King County, plugged August 11, 2003, last operated by Clear Fork Incorporated.
The RRC has issued one drilling permit, issued September 12, 1990, permitted to 4,500 ft.
It was permitted by Harbert Energy Corporation and has since transferred to Clear Fork Incorporated on the wellbore schedule.
Completion filings report 5 formation tops, including Wichita-Albany, Coleman Junction, Dothan, Gunsight.
Its lease has reported 11.3K barrels of oil and 13 mcf of gas since January 1993, last reporting in September 2003.
Operator of record
Permitted by Harbert Energy Corporation; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Dec 4, 2025 · 472 permits on file · (325) 725-2652
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Clear Fork Incorporated |
| Production reports | Clear Fork, Incorporatedthrough Sep 2002 |
| Latest permit | Harbert Energy CorporationSep 12, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Sep 12, 1990
- last permit issued
- Jul 1, 2000
- completed
- 11.3K
- cumulative oil, bbl
- 13
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 1, 2000
- Shut in
- —
- Plugged
- Aug 11, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Masterson Ranch "A" O-11-66572 | Floyce (Bunger Lime) | Clear Fork, Incorporated | 1 | 11.3K | 13 | Jan 1993 – Sep 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Clear Fork, IncorporatedAug 1993 → Sep 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 377887-99 | Drill | Harbert Energy Corporation | Sep 12, 1990 | Sep 12, 1990 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-66572 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,747 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wichita-Albany | 1,716 | 31 |
| Coleman Junction | 2,510 | -763 |
| Dothan | 2,795 | -1,048 |
| Gunsight | 3,493 | -1,746 |
| Bunger Lime | 3,910 | -2,163 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,919 | 3,927 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 310 | 12.25 | 310 S |
| 5.5 | 3,965 | 7.875 | 295 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2000 | Jul 25, 2000 | — |
| 00 | Jan 18, 1994 | Oct 25, 1993 | — |
| 00 | Oct 25, 1990 | Oct 8, 1990 | Yes |
| 00 | Oct 18, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-32016 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-32016 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26932016, documented in the API reference.