WELL · 42-269-32141 · DISTRICT 8
Crum #1
King County · Bacon 107 (Tannehill) field · Vertical
Crum #1 (API 42-269-32141) is a plugged well in King County, plugged February 20, 2003, last operated by Lomax Operating Company Inc..
The RRC has issued one drilling permit, issued March 18, 1994, permitted to 3,500 ft.
It was permitted by Anathema, Inc. and has since transferred to Lomax Operating Company Inc. on the wellbore schedule.
Completion filings report one formation top, including Base Stockweather.
Its lease has reported 7.79K barrels of oil and 105 mcf of gas since May 1994, last reporting in April 2003.
Operator of record
Permitted by Anathema, Inc.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Sep 9, 2011 · 15 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lomax Operating Company Inc. |
| Production reports | Lomax Operating Company, Inc.through Feb 2003 |
| Latest permit | Anathema, Inc.Mar 18, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- Mar 18, 1994
- last permit issued
- May 19, 1994
- completed
- 7.79K
- cumulative oil, bbl
- 105
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Apr 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 19, 1994
- Shut in
- —
- Plugged
- Feb 20, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Crum O-11-67250 | Bacon 107 (Tannehill) | Lomax Operating Company, Inc. | 1 | 7.79K | 105 | May 1994 – Apr 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anathema, Inc.Jun 1994 → Dec 1994
- 2Lomax Operating Company, Inc.Jan 1995 → May 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422025-99 | Drill | Anathema, Inc. | Mar 14, 1994 | Mar 18, 1994 | Apr 27, 1994 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-67250 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,749 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Stockweather | 3,184 | -1,435 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,205 | 3,215 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 208 | 11 | 125 S |
| 4.5 | 3,275 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 24, 1994 | Jun 16, 1994 | Yes |
| 00 | Jun 23, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-32141 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-32141 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26932141, documented in the API reference.