WELL · 42-269-32303 · DISTRICT 8

Simpson #10

Y

King County · Bee Wright (Tannehill) field · NO Production  · Vertical

Simpson #10 (API 42-269-32303) is a well in King County operated by Creed Operating CO. LLC, completed March 31, 1998 and listed as no production on the RRC schedule.

The RRC has issued one drilling permit, issued January 16, 1998, permitted to 3,500 ft.

It was permitted by Westico Energy CO. and has since transferred to Creed Operating CO. LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Stockweather, Tannehill.

Its lease has reported 150K barrels of oil and 47 mcf of gas since January 1993, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Creed Operating Co. LLC

Permitted by Westico Energy Co.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Jul 4, 2026 · 24 permits on file · (940) 781-5759

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCreed Operating Co. LLC
Production reportsCreed Operating Co., LLCthrough May 2023
Latest permitWestico Energy Co.Jan 16, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Jan 16, 1998
last permit issued
Mar 31, 1998
completed
150K
cumulative oil, bbl
47
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 31, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Simpson O-11-66854Bee Wright (Tannehill)Creed Operating Co., LLC9150K47Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Westico Energy Co.Jan 1993 → Nov 2004
  2. 2Continual Oil & Gas, Inc.Dec 2004 → Feb 2007
  3. 3Ross, Dwight M. Drlg. Co., Inc.Mar 2007 → Jan 2008
  4. 4Creed Operating Co., LLCFeb 2008 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472165-99DrillWestico Energy Co.Jan 13, 1998Jan 16, 1998Jan 22, 19983,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66854————

Formation tops

As filed on W-2/G-1. Subsea from 1,765 ft elevation.Download CSV →

FormationMD ftSubsea
Stockweather3,246-1,481
Tannehill3,310-1,545

Perforations

Perforated and open-hole intervals.

FromToType
3,3113,313Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521012.25130 S
4.53,4247.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 17, 1998May 4, 1998Yes
00Jul 2, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104902H-1 InjectionNot activated7501,1003,311–3,313

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26932303, documented in the API reference.