WELL · 42-269-32673 · DISTRICT 8
Springer BG Unit #1
King County · Christopher (Lower Tannehill) field · Producing · Vertical
Springer BG Unit #1 (API 42-269-32673) is a well in King County operated by Sojourner Drilling Corporation, completed February 16, 2007 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued December 12, 2006, permitted to 4,000 ft.
It was permitted by Ginnings Company and has since transferred to Sojourner Drilling Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Coleman Junction, Top Stockether Lime, Tannehill.
Its lease has reported 73.4K barrels of oil and 160 mcf of gas since February 2007, last reporting in July 2026.
Operator of record
Sojourner Drilling Corporation
Permitted by Ginnings Company; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sojourner Drilling Corporation |
| Production reports | Sojourner Drilling Corporationthrough Apr 2026 |
| Latest permit | Ginnings CompanyDec 12, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Dec 12, 2006
- last permit issued
- Feb 16, 2007
- completed
- 73.4K
- cumulative oil, bbl
- 160
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 16, 2007
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Springer BG Unit O-11-69069 | Christopher (Lower Tannehill) | Sojourner Drilling Corporation | 1 | 73.4K | 160 | Feb 2007 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,220 · prior 12 1,403(-13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ginnings CompanyFeb 2007 → May 2013
- 2Sojourner Drilling CorporationJun 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 630367-99 | Drill | Ginnings Company | Dec 11, 2006 | Dec 12, 2006 | Jan 2, 2007 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69069 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,914 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionBASE COLEMAN JUNCTION | 3,190 | -1,276 |
| Top Stockether Lime | 3,650 | -1,736 |
| TannehillTOP TANNEHILL LIME | 3,753 | -1,839 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,728 | 3,731 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 782 | 12.25 | 450 S |
| 4.5 | 3,781 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 10, 2007 | Feb 26, 2007 | Yes |
| 00 | Mar 15, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-32673 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-32673 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26932673, documented in the API reference.