WELL · 42-273-01150 · DISTRICT 4

Borregos K. R. & Seeligson #49

Plugged

Kleberg County · Borregos (Combined Zones) field  · Vertical

Borregos K. R. & Seeligson #49 (API 42-273-01150) is a plugged well in Kleberg County, plugged May 18, 1993, last operated by Eog Resources Inc..

The RRC has issued one drilling permit, issued October 30, 1980, permitted to 7,500 ft.

It was permitted by Exxon Corp. and has since transferred to Eog Resources Inc. on the wellbore schedule.

Its lease has reported 550K barrels of oil and 3.47M mcf of gas since January 1993, last reporting in July 2026. The lease carries 197 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,348 permits on file · (713) 594-5431

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Feb 2024
Latest permitExxon Corp.Oct 30, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Oct 30, 1980
last permit issued
Apr 26, 1984
completed
550K
cumulative oil, bbl
3.47M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 26, 1984
Shut in
—
Plugged
May 18, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 197 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Borregos, K. R. & Seeligson O-4-6544Borregos (Combined Zones)EOG Resources, Inc.197550K3.47MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Mar 2004
  3. 3EOG Resources, Inc.Apr 2013 → Feb 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
97523-99OtherExxon Corp.Oct 30, 1980Oct 30, 1980—7,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-6544————

Perforations

Perforated and open-hole intervals.

FromToType
4,2134,238Perforated
4,2804,289Perforated
4,3214,328Perforated
4,4234,440Perforated
4,4234,470Perforated
4,4484,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,00512.25858 sx
5.57,0538.625875 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 15, 1984May 16, 1984—
00Jan 12, 1984May 16, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
162K
bbl, all reported
Feb 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000041152W-14 DisposalPlugged Jun 9, 19935,0001,5003,175–4,470

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119931994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27301150, documented in the API reference.